Liquefied Natural Gas (LNG) Value Chain: Liquefaction, Storage, Shipping and Regasification – Dubai, 15–19 Mar 2027
DestinationDubai
Dates15 – 19 March 2027
Reference147_10103
This session
15–19 Mar 2027
This Liquefied Natural Gas (LNG) Value Chain: Liquefaction, Storage, Shipping and Regasification session in Dubai runs from Monday 15 March to Friday 19 March 2027 (week 11, Q1 2027). It is the 2nd of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 15 Mar – Friday 19 Mar 2027
Week11 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Staff moving into liquefied natural gas (LNG) projects often understand only their own link of the chain, so feed gas specifications, boil-off losses, cargo scheduling and regasification send-out are planned in isolation and the cryogenic hazards are underestimated. This Core Concept course follows LNG from feed gas pre-treatment and liquefaction through full containment storage, carrier loading and shipping to regasification terminals and FSRUs, then covers LNG safety, contract and pricing basics and small-scale LNG. Participants walk through each facility type and produce an LNG Value Chain Map and Hazard Register for their own role.
Course Objectives:
Explain LNG composition, cryogenic properties, volume reduction and heating value and relate them to feed gas specifications
Describe the pre-treatment units that remove acid gas, water, mercury and heavy hydrocarbons ahead of the cold section
Compare the published liquefaction processes and trace refrigerant cycles and main cryogenic heat exchanger duty on a process flow diagram
Track boil-off gas generation in storage tanks, jetty lines and carrier cargo tanks and select handling routes such as compression, fuel use and reliquefaction
Identify rapid phase transition, cryogenic embrittlement and vapour cloud hazards and match them to the safeguards found on LNG terminals and ships
Interpret the main terms of LNG sale and purchase agreements and price indexation and compile an LNG Value Chain Map and Hazard Register
Target Audience:
Process and mechanical engineers joining liquefaction, storage or regasification projects
Operations and maintenance staff responsible for LNG tank farms, jetties and vaporiser trains
Commercial and shipping staff who schedule cargoes, nominate volumes and administer LNG contracts
Planning and supply chain staff who forecast send-out and coordinate carriers with terminals
HSE advisers responsible for cryogenic hazard assessment at gas terminals
Project and asset integrity staff moving from pipeline gas or oil into LNG assets
Course Outline:
Day 1: LNG Properties and the Value Chain from Gas Field to Market
LNG Value Chain Block Diagram: Feed Gas, Liquefaction, Shipping and Regasification
Methane-Rich Composition, Minus 162 Degree Boiling Point and the 1/600 Volume Ratio
LNG Density, Higher Heating Value and Wobbe Index in Cargo Energy Accounting
Flammable Range of 5 to 15 Percent and Why Liquid LNG Does Not Ignite
Participant Role Baseline: Mapping Each Delegate's Link in the LNG Chain
Day 2: Feed Gas Pre-Treatment and Liquefaction Process Technology
Acid Gas Removal Unit with Amine Solvent for CO2 and H2S Specification
Molecular Sieve Dehydration and Mercury Guard Bed Removal
Heavy Hydrocarbon and NGL Removal Ahead of the Scrub Column
AP-C3MR and AP-X Propane Pre-Cooled Mixed Refrigerant Trains
Cascade, Shell DMR, Linde MFC and Single Mixed Refrigerant Process Comparison
Day 3: LNG Storage, Boil-Off Gas and Carrier Loading
Full Containment Tank Design: Prestressed Concrete Outer Wall and Nickel Steel Inner Tank
Tank Rollover, Stratification Monitoring and Auto-Refrigeration Behaviour
Boil-Off Gas Compressors, Recondensers and Fuel Gas Routing
Jetty Loading Arms, Vapour Return Line and Ship-Shore Link Procedure
Moss Spherical, GTT Membrane Mark III and NO96 and SPB Cargo Containment Systems
Day 4: Regasification, FSRUs and LNG Hazard Safeguards
Open Rack, Submerged Combustion and Intermediate Fluid Vaporiser Selection
FSRU Configuration: Onboard Regasification Skid, Risers and Send-Out Pipeline
Rapid Phase Transition on LNG Spills to Water and Cryogenic Embrittlement of Carbon Steel
Vapour Cloud Dispersion, Pool Fire Radiation and Spill Impoundment Sizing
Emergency Shutdown, Gas and Cold Spill Detection and Cryogenic PPE Requirements
Day 5: LNG Commercial Basics, Small-Scale LNG and the Value Chain Walkthrough
LNG Sale and Purchase Agreement Terms: Take-or-Pay, FOB and DES Delivery
Oil-Indexed Versus Hub-Indexed Pricing with Henry Hub Linked Cargo Examples
Small-Scale LNG: Peak-Shaving Plants, Truck Loading and LNG as Marine and Road Fuel
Walkthrough Exercise: Liquefaction Train, Tank Farm, Jetty and FSRU Layouts
LNG Value Chain Map and Hazard Register Drafting and Peer Review
Skills You Will Gain:
LNG Property Interpretation
Gas Pre-Treatment Specification
Liquefaction Process Recognition
Boil-Off Gas Management
Cargo Containment Awareness
Regasification System Selection
Cryogenic Hazard Identification
LNG Contract Literacy
Why Attend This Course:
Leave with an LNG Value Chain Map and Hazard Register built from walkthroughs of liquefaction, storage, jetty and FSRU layouts
Talk with process, shipping and commercial colleagues using the same terms for boil-off, send-out, cargo energy and delivery point
Spot rapid phase transition, cold spill and vapour cloud scenarios before they appear in a design review or a site visit
Compare LNG practice with engineers, operators and traders from producing, shipping and importing organisations
Conclusion:
Working safely and profitably in LNG depends on seeing how each link of the chain affects the next: feed gas quality sets liquefaction duty, tank heat leak sets boil-off, cargo containment sets shipping losses and vaporiser choice sets send-out. The course moves from LNG properties and the value chain, through pre-treatment and liquefaction technology, storage, boil-off and loading, to regasification, FSRUs and hazard safeguards. The final day adds contract, pricing and small-scale basics and produces an LNG Value Chain Map and Hazard Register for each participant.
Liquefied Natural Gas (LNG) Value Chain: Liquefaction, Storage, Shipping and Regasification runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.