Shutdown, Turnaround and Outage Management: Scope Freeze, Critical Path and Execution Control – Paris, 19–23 Jul 2027
DestinationParis
Dates19 – 23 July 2027
Reference153_10193
This session
19–23 Jul 2027
This Shutdown, Turnaround and Outage Management: Scope Freeze, Critical Path and Execution Control session in Paris runs from Monday 19 July to Friday 23 July 2027 (week 29, Q3 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 19 Jul – Friday 23 Jul 2027
Week29 of 2027
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Shutdown, turnaround and outage (STO) events take whole process units offstream and consume the largest share of a plant's annual maintenance spend, yet many overrun because scope keeps growing after freeze, work packs arrive late, contractors mobilise unprepared and emergent work swamps the critical path. This Core Concept course equips turnaround, planning, operations and maintenance leads to prepare an event against a milestone timeline, challenge and freeze scope, schedule and cost it, control execution day by day and return units to operation. Participants produce a Turnaround Execution Readiness Plan.
Course Objectives:
Set the turnaround strategy, run-length interval and event objectives with operations, maintenance, inspection and finance stakeholders
Run a milestone-based preparation timeline with readiness gates, and challenge and freeze the worklist against clear acceptance criteria
Develop work packs, contractor strategy and mobilisation plans that let crews start on the first shift of the event
Build and level a detailed turnaround schedule, identify its critical and near-critical paths, and estimate and control event cost
Control safety, permits, simultaneous operations, daily progress and emergent work during execution without losing the critical path
Confirm start-up readiness, hand units back to operations and lead a post-turnaround review with KPIs that feed the next event
Target Audience:
Managers who lead turnaround, shutdown or outage organisations and own event scope, schedule and budget
Planning and scheduling staff who build turnaround work packs, logic networks and resource-levelled schedules
Operations leads who define process-related scope, prepare units for isolation and accept equipment back after the event
Maintenance and inspection leads who contribute worklist items, execute mechanical scope and verify quality
Contract and materials coordinators who engage contractors, secure long-lead items and manage site logistics
Safety and permit coordinators who control work authorisation and simultaneous operations during the event
Course Outline:
Day 1: Turnaround Strategy, Interval and Event Governance
STO Event Types: Full Plant Turnaround, Unit Shutdown and Equipment Outage
Run-Length Interval Decision Using Inspection Findings, Catalyst Life and Lost Production Cost
Turnaround Policy, Steering Committee and Event Objectives Charter
Core Turnaround Team Structure and Roles Across Operations, Maintenance and Inspection
Previous Event Performance Baseline and Current-State Readiness Assessment
Day 2: Milestone Preparation Timeline, Scope Challenge and Scope Freeze
Milestone-Based Preparation Timeline with Readiness Gates Counted Back from Shutdown Date
Worklist Collection from Inspection, Process, Projects and Deferred Maintenance Sources
Scope Challenge Criteria: Risk, Must-Do Justification and Online Alternatives
Scope Freeze Rules and Late-Scope Change Request Approval Workflow
Long-Lead Materials Identification, Expediting and Staging Plan
Day 3: Work Packs, Contractors, Scheduling and Cost
Turnaround Work Pack Content: Job Steps, Isolations, Drawings, Materials and Quality Records
Contractor Strategy: Lump-Sum, Unit-Rate and Reimbursable Models with Mobilisation Plan
Shutdown and Start-up Logic Networks with Critical and Near-Critical Path Identification
Resource-Levelled Turnaround Schedule with Crane, Scaffold and Craft Histograms
Turnaround Cost Estimate, Contingency and Earned Value Baseline
Day 4: Execution Control, Safety and Emergent Work
Permit to Work, Isolation Registers and Simultaneous Operations Controls During the Event
Daily Execution Rhythm: Shift Handover, Progress Meetings and Look-Ahead Plans
Progress Measurement and Schedule Recovery on the Critical Path
Emergent Work and Inspection Discovery Handling with Cost and Schedule Impact Review
Mechanical Completion Walkdowns, Box-Up Sequence and Unit Handback Checklist
Day 5: Case Work and the Turnaround Execution Readiness Plan
Refinery Unit Case Study: Scope Growth After Freeze and Critical Path Slip
Power Plant Outage Case Study: Contractor Mobilisation and Emergent Work Pressure
Post-Turnaround Review Workshop: KPI Set, Cost and Schedule Variance and Lessons Learned Log
Turnaround Execution Readiness Plan Drafting for a Participant Event
Plan Presentation and Peer Challenge Panel
Skills You Will Gain:
Turnaround Strategy Setting
Worklist Challenge
Scope Freeze Control
Turnaround Work Pack Development
Contractor Mobilisation Planning
Critical Path Scheduling for Shutdowns
Turnaround Cost Control
Emergent Work Management
Why Attend This Course:
Take back a Turnaround Execution Readiness Plan tested against peer challenge for an upcoming event
Reduce late scope and unplanned overrun by applying readiness gates well before the units come offstream
Give shift and area teams a daily control rhythm that protects the critical path when discovery work appears
Compare shutdown and outage practice with peers from refining, gas processing, petrochemicals and power generation
Conclusion:
Turnaround results are decided in the months before shutdown, through the interval decision, readiness gates, a frozen and challenged worklist, complete work packs and a contractor plan that is ready on the first shift. This course moves from strategy and governance, through preparation milestones and scope control, to work packs, scheduling and cost, then to execution control, permits, emergent work and handback. The final day applies these methods to case events and produces a Turnaround Execution Readiness Plan for review with site leaders.
Shutdown, Turnaround and Outage Management: Scope Freeze, Critical Path and Execution Control runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.