PLC Programming and SCADA Systems: IEC 61131-3, Networks, RTUs and Telemetry – Paris, 20 Sep – 1 Oct 2027
DestinationParis
Dates20 September – 1 October 2027
Reference202_10880
This session
20 Sep – 1 Oct 2027
This PLC Programming and SCADA Systems: IEC 61131-3, Networks, RTUs and Telemetry session in Paris runs from Monday 20 September to Friday 1 October 2027 (week 38, Q3 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 42,300 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 20 Sep – Friday 1 Oct 2027
Week38 of 2027
Duration12 days
Fee42,300 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
PLC programming and SCADA systems decide whether a plant runs to its control narrative or stops on an unexplained trip, a lost network link or an undocumented online edit. This Core Concept course takes automation engineers from PLC hardware, I/O and the IEC 61131-3 languages through timers, sequencing, interlocks and HMI screens, then into industrial networks, SCADA architecture, RTUs and telemetry, redundancy, diagnostics, change control and OT security basics. Participants produce an Automation Project Package: a tested PLC program, SCADA screens, network map and acceptance test record for a process from their own site.
Course Objectives:
Write, structure and test PLC programs in ladder diagram, function block diagram, structured text and sequential function chart to the IEC 61131-3 software model
Implement timers, counters, sequences, permissives and interlocks that make machine and process logic predictable and fault tolerant
Scale analog signals, configure PID function blocks and build HMI screens and faceplates that operators can run without ambiguity
Configure Modbus, Profibus, Profinet, EtherNet/IP and OPC UA links between PLCs, RTUs, HMI and SCADA servers
Design SCADA and telemetry architectures with RTUs, DNP3 or IEC 60870-5-104, historian interfaces and redundant servers and controllers
Diagnose controller, I/O and network faults and manage program changes, acceptance tests and basic IEC 62443 zone and conduit protection
Target Audience:
Automation engineers responsible for writing and commissioning PLC programs on process and machine applications
Control and electrical engineers responsible for panel I/O, controller hardware and plant network design
SCADA engineers responsible for supervisory servers, HMI screens, telemetry links and historian interfaces
Senior instrument and control technicians responsible for fault finding on PLC, RTU and communication equipment
Maintenance engineers responsible for automation spares, program backups and change records
Course Outline:
Day 1: PLC Hardware, I/O Modules and the Scan Cycle
Controller Architecture: Brick and Modular Rack PLCs, CPU, Power Supply and Memory
Digital I/O Modules: Sinking and Sourcing Wiring, Isolation and Terminal Checks
Analog I/O Modules: 4-20 mA and 0-10 V Channels, Resolution and Update Rate
PLC Scan Cycle: Input Image, Program Execution, Output Update and Watchdog Timing
I/O Allocation Table and Tag Naming Convention for a New Automation Project
Day 2: IEC 61131-3 Software Model and Programming Languages
IEC 61131-3 Software Model: Configuration, Resource, Task and Program Organisation Units
Week-One Program Test Record and Functional Walkthrough
Day 6: Industrial Networks and Communication Protocols
Modbus RTU and Modbus TCP: Register Map Design and Master Polling Configuration
Profibus DP and Profinet Device Configuration with Device Description Files
EtherNet/IP Implicit I/O Connections and Explicit Messaging Between Controllers
OPC UA Server and Client Setup: Address Space, Subscriptions and Security Modes
RS-485 and Industrial Ethernet Topologies: Line, Star and Ring with Switch Settings
Day 7: SCADA Architecture, RTUs and Telemetry
SCADA Generations from Monolithic to Web-Based Systems and Supervisory Server Roles
RTU Functions: Autonomous Local Logic, Time-Stamping and Store-and-Forward Buffers
Telemetry Protocols: DNP3 and IEC 60870-5-104 Event Reporting and Polling Cycles
Radio, Cellular and Fibre Telemetry Links: Bandwidth and Latency Budget
SCADA Tag Database, Historian Interface and Alarm Summary Page Configuration
Day 8: Redundancy, Diagnostics and OT Security Basics
Hot-Standby Controllers, Redundant CPUs and Redundant I/O Configuration
Redundant SCADA Servers and Network Ring Recovery Switchover Tests
Controller and Module Diagnostics: Fault Codes, Status Words and Event Logs
IEC 62443 at Overview: Zones, Conduits and Security Levels for PLC and SCADA Networks
Hardening PLC and SCADA Hosts: User Accounts, Remote Access and Backup Images
Day 9: Troubleshooting, Change Management and Automation Performance
Structured Troubleshooting: Symptom Isolation, Signal Trace and Online Logic Monitoring
Communication Fault Diagnosis with Protocol Analysers and Diagnostic Counters
Program Version Control, Online Edits and Change Approval Records
Factory and Site Acceptance Test Protocols for Automation Changes
Automation Performance Indicators: Scan Time, Network Load, Controller Availability and Downtime Causes
Day 10: Capstone: Automation Project Package
Capstone Brief: Process Description, I/O List and Control Narrative
Capstone Build: PLC Program with Sequences and Interlocks Across Four Languages
Capstone Build: SCADA Screens, Historian Tags and Modbus or OPC UA Link
Capstone Test: Simulated Faults, Redundancy Switchover and Change Record
Automation Project Package Presentation and Peer Technical Review
Skills You Will Gain:
Ladder and Structured Text Programming
Sequential Function Chart Design
Interlock and Permissive Logic
HMI Faceplate Design
Industrial Protocol Configuration
RTU and Telemetry Integration
Controller Redundancy Testing
Automation Change Control
Why Attend This Course:
Return with an Automation Project Package: a tested PLC program, SCADA screens, network map and acceptance test record for a process on your own site
Move in week two from writing controller logic to connecting it: networks, SCADA servers, RTUs, telemetry, redundancy and diagnostics
Shorten fault finding on trips and lost communications by working through controller, I/O and network diagnostics in a set order
Compare automation practice with engineers from oil and gas, water, power, utilities and manufacturing plants
Conclusion:
A PLC program only earns trust when its logic is readable, its I/O is documented, its networks are diagnosable and every change is recorded. The first week builds programming capability in the IEC 61131-3 languages, sequencing, interlocks and HMI design. The second week adds industrial protocols, SCADA architecture, RTUs and telemetry, redundancy, diagnostics, change control and IEC 62443 basics. The capstone turns both weeks into an Automation Project Package ready for review at the participant's own site.
PLC Programming and SCADA Systems: IEC 61131-3, Networks, RTUs and Telemetry runs in Paris over 12 days, with 2 upcoming dates in Paris. The course fee is 42,300 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.