Substation Design, Operation and Maintenance: HV/MV Busbars, Equipment and Switching – Paris, 5–16 Apr 2027
DestinationParis
Dates5 – 16 April 2027
Reference242_11453
This session
5–16 Apr 2027
This Substation Design, Operation and Maintenance: HV/MV Busbars, Equipment and Switching session in Paris runs from Monday 5 April to Friday 16 April 2027 (week 14, Q2 2027). It is the 1st of 2 dates in Paris in 2027, at a fee of 42,300 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 5 Apr – Friday 16 Apr 2027
Week14 of 2027
Duration12 days
Fee42,300 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Substation design, operation and maintenance decisions are often made bay by bay, so busbar schemes, equipment ratings, auxiliary supplies, automation and switching rules drift apart as a site grows, and a single breaker failure or switching error can drop several feeders. This Core Concept course equips engineers and senior operators to treat the HV and MV substation as one system: selecting busbar arrangements and primary equipment, checking insulation, clearances and auxiliaries, interfacing control and protection, and running safe switching and condition-based maintenance. Participants produce a Substation Design and Operations Review for their own site.
Course Objectives:
Select substation types and busbar arrangements that balance supply security, maintainability and cost for a given network role
Specify primary equipment for each bay, including power transformers, circuit breakers, disconnectors, instrument transformers and surge arresters, and justify GIS or AIS construction
Check substation layouts against insulation coordination, clearance, earthing and auxiliary AC and DC supply requirements
Evaluate control, SCADA and protection interfaces built on IEC 61850 station and process bus architectures
Direct switching programmes, interlocking and safety documentation for outages, extensions and commissioning of new bays
Build a condition-based maintenance and performance review for a substation using diagnostic data, health indices and reliability KPIs
Target Audience:
Substation design engineers who prepare single-line diagrams, layouts and equipment specifications for new and extended sites
Transmission and distribution engineers accountable for substation performance, outages and network security
Senior operators and control engineers who authorise switching programmes and safety documents
Asset managers who set maintenance strategy and renewal priorities for substation equipment
Project and commissioning leads who coordinate substation extensions with network operators and contractors
Course Outline:
Day 1: Substation Types, Functions and Single-Line Diagrams
Transmission, Distribution, Collector, Converter and Switching Substation Functions
Mobile Substations for Emergency Supply and Planned Outage Cover
Single-Line Diagram Reading: Bays, Feeders, Couplers and Device Designations
Voltage Level Selection and Transformation Ratio Choices Across HV and MV Busbars
Substation Functional Specification Checklist for a New or Extended Site
Day 2: Busbar Arrangements and Primary Equipment Selection
Single, Sectionalised and Double Busbar Arrangement Comparison
Breaker-and-a-Half and Ring Bus Schemes: Supply Security Versus Capital Cost
Power Transformer Rating, Cooling Mode and Tap Changer Choices at Station Level
Circuit Breaker, Disconnector and Earthing Switch Duty Allocation per Bay
Current and Voltage Transformer Cores, Burdens and Accuracy Classes for Metering and Protection
Day 3: Insulation Coordination, Surge Arresters and GIS Versus AIS
Lightning and Switching Overvoltage Sources in HV Substations
Insulation Level Selection and Coordination Principles Overview
Metal-Oxide Surge Arrester Placement, Protective Distance and Energy Ageing
Air-Insulated Substation Footprint, Extension Flexibility and Environmental Exposure
Gas-Insulated Substation Compartments, Insulating Gas Choices and Land Area Saving
Day 4: Layout, Clearances, Earthing Grid and Auxiliary Supplies
Substation Layout Drawing: Bay Spacing, Access Roads and Heavy Equipment Transport Routes
Phase-to-Phase, Phase-to-Earth and Working Section Clearance Checks
Earthing Grid Overview: Step and Touch Voltage Concepts and Fence Bonding
Station Service AC Supply: Auxiliary Transformers, Changeover Schemes and Essential Loads
DC System Design: Battery Duty Cycle Sizing, Chargers and Earth Fault Monitoring
Day 5: Week-One Integration: Guided Substation Design Case Study
Case Substation Brief: Load Growth, Incoming Circuits and Outgoing Feeders
Busbar Scheme Selection Matrix for the Case Substation
Bay Equipment Schedule Drafted from the Case Single-Line Diagram
Layout Sketch Review Against Clearance, Fire Separation and Access Criteria
Week-One Design Basis Memorandum and Open Issues Register
Day 6: Substation Automation, SCADA and Protection Interfaces
Substation Automation Hierarchy: Process, Bay and Station Levels
IEC 61850 Station Bus, Process Bus, GOOSE and Sampled Values Overview
Substation Configuration Language Files and IED Engineering Workflow
SCADA Telecontrol Gateways Using DNP3 and Modbus Protocols
Protection Zones, Zone Overlap and Bay Trip Matrix Interfaces
Day 7: Switching Operations, Safety Rules and Operational Risk
Switching Programme Preparation, Independent Checking and Authorisation Chain
Interlocking Logic Between Breakers, Disconnectors and Earthing Switches
Isolation, Proving Dead, Circuit Earthing and Safety Document Issue for Substation Work
Operational Risk Assessment for Live Substation Extensions and Busbar Outages
Incident Case Review: Switching Error, Wrong Bay Access and Lessons Learnt
Day 8: Testing, Commissioning and Stakeholder Coordination
Factory and Site Acceptance Test Sequence for a Substation Extension
Bay Energisation Plan and Outage Request Coordination with the Network Control Centre
Scheme Tests: End-to-End Protection and Interlock Verification Across Bays
Interface Management Between Asset Owner, EPC Contractor, OEMs and Network Operator
Operations Handover Pack: As-Built Single-Line Diagram, Settings Records and Operating Instructions
Day 9: Condition-Based Maintenance, Diagnostics and Performance KPIs
Condition Monitoring Data Sources: Online Sensors, Routine Inspections and Test History
Diagnostic Technique Selection by Asset Class: Thermography, Partial Discharge and Dissolved Gas Analysis
Health Index Scoring and Criticality Ranking for Substation Assets
Substation Reliability KPIs: Availability, Forced Outage Rate and Mean Time to Restore
Maintenance Strategy Review: Time-Based to Condition-Based Transition Plan
Day 10: Capstone: Substation Design and Operations Review
Participant Substation Data Pack Assembly and Single-Line Diagram Mark-Up
Design Adequacy Review: Busbar Scheme, Equipment Ratings and Clearances
Operations Review: Switching Procedures, Auxiliary Supply Resilience and Automation Status
Maintenance and Risk Action Register With Owners and Priorities
Substation Design and Operations Review Presentation and Peer Challenge
Skills You Will Gain:
Busbar Scheme Selection
Primary Equipment Specification
Insulation Coordination Judgement
Substation Layout Checking
Auxiliary Supply Design
Substation Automation Interfacing
Switching Programme Authorisation
Condition-Based Asset Prioritisation
Why Attend This Course:
Return with a Substation Design and Operations Review for your own site, marked up on its single-line diagram
Recognise where a busbar scheme, bay rating or auxiliary supply leaves a single point of failure before it causes a multi-feeder outage
Challenge switching programmes, interlocks and automation interfaces with the questions an experienced substation engineer asks
Compare substation practice with engineers from transmission and distribution utilities, generation, oil and gas, and heavy industry
Conclusion:
A substation performs as intended when its busbar scheme, equipment, insulation, auxiliaries, automation and operating rules are designed and managed together. Week one builds design capability, from substation types and single-line diagrams through busbar arrangements, equipment selection, GIS and AIS construction, layout and auxiliary supplies, closing with a guided design case study. Week two adds automation interfaces, switching and safety rules, commissioning coordination and condition-based maintenance, and the final day produces a Substation Design and Operations Review for each participant's own site.
Substation Design, Operation and Maintenance: HV/MV Busbars, Equipment and Switching runs in Paris over 12 days, with 2 upcoming dates in Paris. The course fee is 42,300 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.