Power Cable Engineering: MV and HV Cable Rating, Jointing, Testing and Fault Location – Dubai, 4–8 Jan 2027
DestinationDubai
Dates4 – 8 January 2027
Reference256_11645
This session
4–8 Jan 2027
This Power Cable Engineering: MV and HV Cable Rating, Jointing, Testing and Fault Location session in Dubai runs from Monday 4 January to Friday 8 January 2027 (week 1, Q1 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 4 Jan – Friday 8 Jan 2027
Week1 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Power cable failures on medium and high voltage networks are expensive to find, slow to repair and often traced to a rating assumption, a poorly bonded screen or a badly made joint. Many utilities and industrial sites also carry ageing paper and early XLPE circuits with no clear condition evidence. This Core Concept course equips engineers and supervisors to rate power cable circuits, plan installation and screen bonding, control jointing quality, interpret diagnostic tests, locate faults and rank circuits for replacement. Participants build a Cable Circuit Rating and Condition Assessment File for one of their own circuits.
Course Objectives:
Select conductor material, insulation type and screen design for a medium or high voltage cable circuit from its duty and route conditions
Calculate continuous current rating with derating for burial depth, soil thermal resistivity, ducts and grouping, and check short-circuit and voltage drop limits
Choose solid, single-point or cross-bonded screen arrangements and estimate standing sheath voltages and circulating current losses
Plan cable pulls and supervise jointing and termination work against pulling tension, sidewall pressure, bending radius and accessory installation limits
Interpret VLF withstand, tan delta, partial discharge and sheath integrity results and locate cable faults with pre-location and pinpointing methods
Rank cable circuits by condition, failure history and consequence to support repair, refurbishment or replacement decisions
Target Audience:
Engineers responsible for specifying and rating medium and high voltage cable circuits on utility and industrial networks
Supervisors who direct cable laying, pulling, jointing and termination crews
Testing and diagnostics staff who carry out withstand, tan delta, partial discharge and sheath tests on installed cables
Maintenance engineers who respond to cable faults and restore supply after failures
Asset and network planning engineers who keep cable records and prepare replacement programmes
Course Outline:
Day 1: Power Cable Construction, Insulation Systems and Network Baseline
Copper and Aluminium Conductor Forms: Stranded, Compacted and Segmental Designs
XLPE, EPR and Paper-Insulated Lead-Covered Insulation Compared by Voltage Class
Semiconducting Screens, Metallic Screen Types and Polymeric Oversheath Functions
Cable Datasheet and Type Designation Reading for Medium and High Voltage Circuits
Cable Network Baseline Register: Age, Insulation Type, Route Length and Failure Records
Day 2: Current Rating, Derating Factors and Screen Bonding Design
Continuous Current Rating Method: Conductor Losses, Dielectric Losses and Thermal Resistance Chain
Derating Factors for Burial Depth, Soil Thermal Resistivity, Ducts and Circuit Grouping
Short-Circuit Thermal Withstand Check for Conductor and Metallic Screen
Voltage Drop Calculation for Long Feeders at Full Load and Emergency Load
Solid, Single-Point and Cross-Bonding Schemes with Sheath Voltage Limiters and Link Boxes
Day 3: Cable Route Installation, Pulling and Jointing Practice
Route Survey, Trench Profile, Duct Bank Layout and Thermal Backfill Selection
Pulling Tension and Sidewall Pressure Calculation for Duct and Trench Routes
Minimum Bending Radius, Drum Handling and Cable Laying Sequence Control
Heat-Shrink, Cold-Shrink and Premoulded Joint Installation Steps and Hold Points
Indoor, Outdoor and Separable Termination Selection and Stress Control Methods
Day 4: Cable Diagnostics, Fault Location and Failure Modes
VLF Withstand Testing: Test Voltage Selection, Duration and Pass Criteria
Tan Delta Measurement and Water Tree Ageing Assessment in Polymeric Cables
Partial Discharge Testing Offline and Online with Defect Location Mapping
Oversheath Integrity Testing and Sheath Fault Location on Bonded Circuits
Fault Pre-Location by Time Domain Reflectometry and Arc Reflection with Acoustic Pinpointing
Day 5: Cable Circuit Rating and Condition Assessment Build
Case Circuit Data Assembly: Route Drawing, Bonding Diagram and Test History
Case Circuit Rating Calculation Sheet with Derating and Emergency Load Scenarios
Joint Failure Case Review: Workmanship Defects Found by Partial Discharge Mapping
Condition and Consequence Scoring Matrix for Repair, Refurbish or Replace Decisions
Cable Circuit Rating and Condition Assessment File Drafting and Peer Review
Skills You Will Gain:
Cable Insulation Selection
Current Rating Calculation
Screen Bonding Design
Cable Pull Planning
Joint and Termination Quality Control
Cable Diagnostic Test Interpretation
Cable Fault Location
Cable Replacement Prioritisation
Why Attend This Course:
Return with a Cable Circuit Rating and Condition Assessment File covering the rating, bonding, test results and replacement ranking of one of your own circuits
Recognise rating shortfalls, bonding errors and jointing defects before they turn into outages
Shorten fault restoration time by choosing the right pre-location and pinpointing method for the cable type
Compare cable practice with engineers from utilities, oil and gas, petrochemicals, renewables and large industrial sites
Conclusion:
A power cable circuit stays in service when its rating, bonding, installation, accessories and test evidence are managed as one system over its life. The course moves from cable construction and insulation types, through current rating, derating, short-circuit and voltage drop checks and screen bonding, to route installation, pulling and jointing. It then covers VLF, tan delta, partial discharge and sheath testing and fault location, before the final day produces a Cable Circuit Rating and Condition Assessment File ready for the next network decision.
Power Cable Engineering: MV and HV Cable Rating, Jointing, Testing and Fault Location runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.