Project Cost Estimating: Estimate Classes, Unit Rates and Basis of Estimate – London, 26 Jul – 6 Aug 2027
DestinationLondon
Dates26 July – 6 August 2027
Reference261_11716
This session
26 Jul – 6 Aug 2027
This Project Cost Estimating: Estimate Classes, Unit Rates and Basis of Estimate session in London runs from Monday 26 July to Friday 6 August 2027 (week 30, Q3 2027). It is the 2nd of 2 dates in London in 2027, at a fee of 41,400 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 26 Jul – Friday 6 Aug 2027
Week30 of 2027
Duration12 days
Fee41,400 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Project cost estimating decides whether a capital project is approved, funded and bid at a realistic figure, yet many estimates reach sponsors with an unclear class, untraceable unit rates and a contingency nobody can explain. This Core Concept course builds the estimating discipline to classify an estimate by project definition, apply capacity-factored, parametric, analogous and bottom-up methods, price labour, plant and materials, add indirects, escalation and contingency, and document it all in a basis of estimate. Participants finish with a Basis of Estimate and Class-Rated Estimate Workbook for a capital project of their own.
Course Objectives:
Classify a capital project estimate by project definition maturity and state its expected accuracy range using the AACE 18R-97 classification
Prepare estimates with capacity-factored, parametric, analogous and bottom-up methods and choose the method that fits the available design deliverables
Build unit rates from quantity take-off, labour productivity, crew composition, equipment rates and material quotations
Add field and home-office indirects, owner costs, escalation and location adjustments to a direct cost estimate
Quantify contingency with risk-based range estimating and review an estimate against benchmarks and historical returns
Write and defend a basis of estimate that records scope basis, pricing basis, methods, assumptions, inclusions and exclusions
Target Audience:
Estimating staff who prepare owner, feasibility and bid estimates for capital projects
Quantity surveying staff responsible for measurement, take-off and unit rate pricing
Cost engineering staff who set estimating standards, cost codes and historical cost databases
Project controls staff who receive estimates and convert them into control budgets
Engineering and design staff who supply scope deliverables and equipment lists to the estimating team
Commercial and tendering staff who assemble contractor bid prices and qualifications
Course Outline:
Day 1: Estimate Purpose, Project Definition and Cost Elements
Estimate End Uses: Screening, Feasibility, Funding Authorisation, Control and Bid
Scope Definition Deliverables Checklist for Process, Building and Infrastructure Assets
Owner Estimate Versus Contractor Bid Estimate: Pricing Perspective and Exclusions
Direct, Indirect, Owner and Allowance Cost Elements in an Estimate Summary
Estimating Plan: Team Roles, Data Sources, Timeline and Review Points
Day 2: Estimate Classification and Breakdown Structures
AACE 18R-97 Five Estimate Classes and Project Definition Maturity Levels
Expected Accuracy Range Bands by Class and the Factors That Widen Them
Work Breakdown Structure Coding for Estimate Roll-Up
Cost Breakdown Structure and Code of Accounts Mapping by Discipline
Estimate Class Selection Matrix Against Available Design Deliverables
Day 3: Conceptual and Detailed Estimating Methods
Capacity-Factored Estimates and Cost-Capacity Exponent Scaling
Equipment-Factored Estimates Using Installation Factor Sets
Analogous Estimating from Completed Project Returns with Size, Location and Time Adjustment
Parametric Cost Models Built by Regression on Historical Unit Costs
Bottom-Up Detailed Estimate: Quantity, Unit Rate and Extension Logic
Day 4: Quantity Take-Off, Unit Rates, Labour, Plant and Materials
Quantity Take-Off from Drawings and 3D Models Using Standard Measurement Rules
Unit Rate Build-Up from Labour, Plant, Material and Subcontract Components
Labour Productivity Norms, Man-Hour Units and Productivity Adjustment Factors
Crew Build-Up Sheets and Composite Crew Rate Calculation
Equipment Ownership and Operating Rates and Material Quotation Bid Tabulation
Day 5: Week-One Case: Estimating a Treatment Plant Expansion
Case Brief: Water Treatment Plant Expansion Scope Package and Design Status
Capacity-Factored Screening Figure for the Case Plant
Civil and Structural Take-Off and Unit Rate Extension for the Case
Mechanical Package Pricing from Vendor Quotations and Freight Terms
Case Estimate Summary Sheet and Peer Arithmetic Check
Day 6: Indirect Costs, Escalation and Location Pricing
Field Indirects: Site Establishment, Temporary Facilities, Supervision and Utilities
Home-Office Engineering, Procurement Services and Owner Cost Build-Up
Escalation from Published Cost Indices Applied to the Spend Profile Midpoint
Location Factors, Currency Conversion and Imported Content Pricing
Freight, Duties, Capital Spares, Start-Up and Commissioning Allowances
Day 7: Contingency, Range Estimating and Estimate Quality
Contingency, Allowances and Management Reserve: Definitions and Boundaries
Percentage and Expert-Judgement Contingency and Its Limits
Range Estimating on Critical Cost Items with Low, Most Likely and High Values
Concept-Level Monte Carlo Simulation and Reading Confidence Level Outputs
Estimate Quality Review Checklist and Red-Flag Tests
Day 8: Basis of Estimate Documentation and Stakeholder Communication
Basis of Estimate Structure: Scope Basis, Pricing Basis, Methods, Assumptions, Inclusions and Exclusions
Assumptions, Qualifications and Exclusions Register
Reconciliation Between Successive Estimate Classes and Explanation of Movement
Presenting Estimate Ranges to Sponsors, Investment Committees and Lenders
Estimate Handover Package to Project Controls and Procurement Teams
Day 9: Benchmarking, Historical Data and Estimating Improvement
Benchmark Metrics: Cost per Unit Capacity, Cost per Square Metre and Ratio Checks
Historical Cost Database Design and Normalisation of Completed Projects
Estimate Accuracy Tracking: Estimated Versus Final Cost by Class
Independent Estimate Review and Validation Panel Procedure
Estimating Function Improvement Plan and Lessons Learned Capture
Day 10: Capstone: Building and Defending a Basis of Estimate
Capstone Scope Selection: Own Capital Project and Target Estimate Class
Class-Rated Estimate Workbook Completion with Indirects and Escalation
Contingency Range Output and Confidence Level Recommendation
Basis of Estimate Defence Before a Review Panel
Panel Challenge Log and Final Estimate Revision
Skills You Will Gain:
Estimate Classification
Quantity Take-Off
Unit Rate Analysis
Crew and Productivity Analysis
Conceptual Cost Modelling
Escalation and Location Adjustment
Range Estimating
Estimate Benchmarking
Why Attend This Course:
Return with a Basis of Estimate and Class-Rated Estimate Workbook for a capital project of your own, already tested by a review panel
Explain to sponsors which estimate class a figure represents and why its accuracy range is as wide as it is
Trace every unit rate back to productivity, crew, plant and material inputs so reviewers can check it
Compare estimating practice with peers from process, building, water and infrastructure projects
Conclusion:
A reliable estimate is traceable: its class matches the project definition, its unit rates rest on productivity and pricing evidence, and its contingency reflects measured uncertainty. Week one covers classification, breakdown structures, estimating methods and pricing, closing with a guided plant case. Week two adds indirects, escalation, contingency and range estimating, basis of estimate documentation, benchmarking and review. The final day produces a Basis of Estimate and Class-Rated Estimate Workbook that participants defend before a panel and take back to their project.
Project Cost Estimating: Estimate Classes, Unit Rates and Basis of Estimate runs in London over 12 days, with 2 upcoming dates in London. The course fee is 41,400 SAR.