Risk Based Inspection (RBI) for Static Equipment: Damage Mechanisms and Inspection Planning – London, 2–6 Aug 2027
DestinationLondon
Dates2 – 6 August 2027
Reference269_11828
This session
2–6 Aug 2027
This Risk Based Inspection (RBI) for Static Equipment: Damage Mechanisms and Inspection Planning session in London runs from Monday 2 August to Friday 6 August 2027 (week 31, Q3 2027). It is the 2nd of 2 dates in London in 2027, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 2 Aug – Friday 6 Aug 2027
Week31 of 2027
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Risk based inspection (RBI) fails when fixed inspection intervals, generic damage lists and scattered thickness records decide where inspectors go, leaving high-risk vessels and piping under-inspected while low-risk items absorb turnaround budget. This Core Concept course equips inspection and integrity engineers to set up an RBI programme for static equipment, screen damage mechanisms by corrosion loop, rank probability and consequence of failure, judge inspection effectiveness and set risk-driven intervals. Participants produce a Risk-Based Inspection Plan and Reassessment Register for one process unit from their own plant.
Course Objectives:
Define the scope, team, risk targets and work process of an RBI programme for pressure vessels, process piping and heat exchangers using API RP 580 and ASME PCC-3
Divide a process unit into corrosion loops and screen each loop for credible damage mechanisms as API RP 571 describes them
Estimate probability of failure and consequence of failure for equipment items and plot them on a risk matrix at qualitative, semi-quantitative or quantitative depth
Select inspection methods, coverage and effectiveness category for each active damage mechanism and set the next inspection date from the risk target
Set integrity operating windows and reassessment triggers that keep the RBI results valid between inspections
Build a Risk-Based Inspection Plan and Reassessment Register that feeds turnaround inspection scope
Target Audience:
Inspection engineers who plan and approve inspection scopes for vessels, piping and exchangers
Integrity engineers who own equipment risk rankings, remaining life estimates and inspection intervals
Corrosion and materials engineers who assign damage mechanisms and expected degradation rates
Process engineers who define operating limits that affect equipment degradation
Turnaround and maintenance planners who convert inspection plans into work packs
Inspection data coordinators who maintain thickness monitoring locations and equipment history records
Course Outline:
Day 1: RBI Principles and Programme Baseline
Time-Based Versus Risk-Based Inspection Intervals: Cost and Coverage Comparison
Risk Definition as Probability of Failure Multiplied by Consequence of Failure
RBI Programme Scope: Pressure Vessels, Process Piping, Heat Exchangers and Relief Devices
RBI Team Roles: Inspection, Corrosion, Process, Operations and Risk Facilitator
Unit Inspection Baseline: Equipment Register, Thickness History and Past Findings Review
Day 2: RBI Standards, Methodology Levels and Corrosion Loops
API RP 580 Elements of a Risk-Based Inspection Program: Work Process Walkthrough
API RP 581 Risk Based Inspection Methodology: Calculation Structure at Overview
ASME PCC-3 Inspection Planning Using Risk-Based Methods: Scope and Comparison
Qualitative, Semi-Quantitative and Quantitative RBI Selection Criteria
Corrosion Loop Definition from Process Flow Diagrams and Heat and Material Balances
Day 3: Damage Mechanism Screening and Failure Likelihood
API RP 571 Damage Mechanism Screening: Thinning, Cracking, Metallurgical and Mechanical Families
Susceptibility Tables for Wet H2S Cracking, Chloride Stress Corrosion Cracking and High Temperature Hydrogen Attack
Damage Factor Logic: Thinning Rate, Remaining Life and Inspection History Credit
Probability of Failure Categories from Generic Failure Frequency and Management System Factor
Consequence of Failure Modelling: Flammable Release Area, Toxic Impact, Environmental Loss and Business Interruption
Day 4: Inspection Effectiveness, Operating Windows and Reassessment
Inspection Effectiveness Categories: Highly to Ineffective by Method and Coverage
Non-Destructive Examination Method Selection per Damage Mechanism: UT, RT, PAUT, TOFD and WFMT
Integrity Operating Windows: Critical, Standard and Informational Limits with Response Actions
RBI Data Management: Thickness Monitoring Locations, Inspection Database Quality and Audit Trail
Reassessment Triggers: Process Changes, Feed Changes, Unexpected Findings and Excursions Beyond Limits
Day 5: Unit Case Study and the Risk-Based Inspection Plan
Refinery Hydrotreater Case: Loop Screening and Risk Matrix Placement
Gas Processing Amine Unit Case: Cracking Mechanism Ranking and Inspection Method Choice
Turnaround Scope Link: Converting RBI Due Dates into Shutdown Inspection Work Packs
Own-Unit Risk-Based Inspection Plan and Reassessment Register Build
Peer Challenge Panel on Risk Rankings, Intervals and Deferral Justifications
Skills You Will Gain:
Corrosion Loop Mapping
Damage Mechanism Screening
Failure Probability Estimation
Consequence Modelling
Risk Matrix Interpretation
Inspection Effectiveness Grading
Operating Window Definition
Inspection Data Governance
Why Attend This Course:
Return with a Risk-Based Inspection Plan and Reassessment Register built on a process unit from your own plant
Move inspection effort from low-risk items to the vessels and piping circuits where failure would hurt most
Defend inspection intervals, deferrals and turnaround scope to operations and management with risk evidence
Compare RBI practice with inspection and integrity engineers from refining, petrochemical and gas processing sites
Conclusion:
Inspection resources deliver most when every interval can be traced to a damage mechanism, a probability and consequence estimate and a measured inspection effectiveness. The course moves from RBI principles and the unit baseline, through API RP 580, API RP 581, ASME PCC-3 and corrosion loops, to damage mechanism screening, failure likelihood and consequence, inspection effectiveness, integrity operating windows and reassessment triggers. The final day applies this to refinery and gas processing cases and produces a Risk-Based Inspection Plan and Reassessment Register ready for the next turnaround.
Risk Based Inspection (RBI) for Static Equipment: Damage Mechanisms and Inspection Planning runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.
Looking for training courses in London? CoreConsept Training Center delivers professional training in London across governance, leadership, ESG, project management and digital transformation — open enrolment programmes in central London venues.