LNG Bunkering and LNG as Marine Fuel: Fuel Gas Systems, Transfer Operations and Safety Zones – Paris, 10–14 May 2027
DestinationParis
Dates10 – 14 May 2027
Reference276_11929
This session
10–14 May 2027
This LNG Bunkering and LNG as Marine Fuel: Fuel Gas Systems, Transfer Operations and Safety Zones session in Paris runs from Monday 10 May to Friday 14 May 2027 (week 19, Q2 2027). It is the only date in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 10 May – Friday 14 May 2027
Week19 of 2027
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
LNG bunkering brings a cryogenic, flammable fuel alongside a ship that may be carrying passengers, cargo or other operations at the same time, so a weak transfer plan, an unclear safety zone or an untested emergency release can quickly turn a routine fuelling into a gas release. This Core Concept course prepares ship and bunker supplier staff to handle LNG as marine fuel, from fuel tank and fuel gas supply system behaviour through truck-to-ship, ship-to-ship and shore-to-ship transfers to bunker delivery records and methane slip. Participants produce an LNG Bunkering Operations Plan for a vessel or bunkering location of their own.
Course Objectives:
Explain why operators choose LNG as marine fuel and relate sulphur, NOx, EEDI and CII drivers to fuel system selection on their own vessels
Operate and monitor ship fuel gas supply systems, Type C and membrane fuel tanks and boil-off gas handling within the limits set by the IGF Code
Plan and run truck-to-ship, ship-to-ship and shore-to-ship LNG bunker transfers using agreed checklists, communication and transfer rates
Set out safety and security zones, control simultaneous operations and apply emergency release couplings and ship-shore ESD links during a bunker transfer
Verify delivered LNG quantity and quality and complete the bunker delivery note with supporting measurement records
Compile an LNG Bunkering Operations Plan covering crew competence, approvals, emergency response and methane slip control
Target Audience:
Deck and engine staff responsible for fuel handling on LNG-fuelled ships
Bunker vessel and bunker truck crews who connect, transfer and disconnect LNG
Technical staff who supervise fuel gas systems, fuel tanks and maintenance on gas-fuelled fleets
Marine operations staff who coordinate bunker scheduling, berth allocation and simultaneous cargo or passenger activity
HSE staff responsible for gas release, cryogenic and fire risk during fuelling
Course Outline:
Day 1: LNG as Marine Fuel: Drivers, Fuel Properties and Fleet Baseline
MARPOL Sulphur Cap, NOx Limits and the Shift from Heavy Fuel Oil to Gas
EEDI and CII Rating Effects of LNG-Fuelled Propulsion
Dual-Fuel Two-Stroke, Four-Stroke and Gas-Only Engine Configurations
Cryogenic Burn, Brittle Fracture of Deck Steel and Rapid Phase Transition on Water
Fleet Gas-Fuel Readiness Baseline Checklist
Day 2: IGF Code Framework, Fuel Containment and Fuel Gas Supply Systems
IGF Code Goal-Based Structure: Functional Requirements for Gas-Fuelled Ships
IMO Type C Pressure Tanks Versus Membrane Fuel Tanks: Pressure Build-Up and Holding Time
Tank Connection Space, Double-Walled Gas Piping and Gas Valve Unit Layout
Fuel Gas Supply System: Vaporiser, Pressure Build-Up Unit and Low- and High-Pressure Feed
Boil-Off Gas Handling on the Fuelled Ship: Consumption, Gas Combustion Unit and Venting Limits
Day 3: Bunkering Methods, Procedures and Transfer Checklists
Truck-to-Ship Bunkering: Road Tanker Positioning, Hose Handling and Rate Limits
Ship-to-Ship Bunkering: Bunker Vessel Mooring, Fenders and Transfer Sequence
Shore-to-Ship and Pipeline Bunkering from Terminal or Storage Tank
SGMF Bunker Safety Checklists: Pre-Bunkering, Pre-Transfer and Post-Bunkering
Line Cool-Down, Top-Filling Versus Bottom-Filling and Vapour Return Management
Day 4: Safety Zones, SIMOPS, Emergency Release and Methane Slip
Hazardous Area Safety Zone and Wider Security Zone Definition Around the Bunker Manifold
Simultaneous Operations Risk Assessment During Cargo Work and Passenger Embarkation
Emergency Release Coupling, Dry-Break Coupler and Ship-Shore ESD Link Testing
Bunker Quantity and Quality Measurement: Mass Flow Meter, Tank Gauging, Sampling and the Bunker Delivery Note
Methane Slip Sources: Engine Combustion, Venting and Purging with Mitigation Options
Day 5: Bunkering Simulation and LNG Bunkering Operations Plan
Timed Simulation: Hose Leak and ESD Trip During Ship-to-Ship Transfer
Timed Simulation: Truck-to-Ship Transfer Interrupted by a SIMOPS Conflict
Crew Competence Matrix for IGF Code Training and Bunker Team Roles
Port Approval Request Pack at Overview: Operator Qualification, Risk Assessment and Notifications
LNG Bunkering Operations Plan Drafting and Peer Review
Skills You Will Gain:
Gas-Fuelled Ship Operation
Fuel Tank Pressure Management
Bunker Transfer Planning
Bunkering Checklist Application
Safety Zone Setting
Emergency Release Testing
Bunker Quantity Verification
Methane Slip Control
Why Attend This Course:
Return with an LNG Bunkering Operations Plan prepared for a vessel or bunkering location you work with
Rehearse ESD trips, hose leaks and SIMOPS conflicts in timed simulations before facing them alongside a live bunker vessel or truck
Agree zones, rates, stop signals and records with bunker suppliers, terminals and port staff in the same terms
Compare fuelling practice with crews and technical staff from ferry, container, tanker, cruise and offshore support fleets
Conclusion:
Safe LNG bunkering depends on the ship, the supplier and the port working to one plan, with fuel system behaviour understood and emergency controls tested before the first hose is connected. The course moves from the drivers for LNG as marine fuel and its hazards, through the IGF Code, fuel tanks and fuel gas supply systems, to bunkering methods and checklists, then to safety zones, SIMOPS, emergency release, bunker measurement and methane slip. The final day applies timed simulations and produces an LNG Bunkering Operations Plan.
LNG Bunkering and LNG as Marine Fuel: Fuel Gas Systems, Transfer Operations and Safety Zones runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.