Construction Insurance: Contractors All Risks, Erection All Risks and Site Claims – London, 31 May – 4 Jun 2027
DestinationLondon
Dates31 May – 4 June 2027
Reference308_12374
This session
31 May – 4 Jun 2027
This Construction Insurance: Contractors All Risks, Erection All Risks and Site Claims session in London runs from Monday 31 May to Friday 4 June 2027 (week 22, Q2 2027). It is the 2nd of 2 dates in London in 2027, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 31 May – Friday 4 Jun 2027
Week22 of 2027
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Construction insurance on many schemes is arranged late, copied from an earlier tender and never checked against the employer's requirements, so a collapsed formwork, a flooded excavation or a transformer dropped in transit exposes unprotected works, disputed excesses and missed notices. This Core Concept course equips site, contracts and engineering leads to specify contractors all risks (CAR) and erection all risks (EAR) policies, third-party and professional indemnity wordings, delay in start-up (DSU) and project cargo, choose between OCIP and CCIP wrap-ups, and steer incidents with brokers and adjusters. Participants produce a CAR and EAR Placement Matrix with a Site Incident Protocol.
Course Objectives:
Screen the hazards of a building, civil or plant scheme and route each to CAR or EAR policies, bonds, allocation under the conditions of contract or self-retention
Specify CAR and EAR sections for permanent works, temporary works and plant, setting sums insured, commissioning periods, maintenance visits and excesses
Set third-party, professional indemnity, DSU and project cargo requirements consistent with the employer's requirements and lender terms
Compare owner-controlled (OCIP) and contractor-controlled (CCIP) wrap-up programmes and decide which party procures each policy
Reconcile the policy provisions of FIDIC Red, Yellow and Silver Book conditions and subcontracts with certificates issued, and separate bonds from indemnity policies
Notify, evidence and settle damage to the works with underwriters, brokers and adjusters using a site incident protocol
Target Audience:
Site and construction leads accountable for temporary works, incidents on site and handover of completed sections
Contracts and commercial leads who draft and administer indemnity, bond and policy provisions in main contracts and subcontracts
Insurance and treasury specialists who procure or approve CAR, EAR and wrap-up programmes for employers, developers or contractors
Engineering and design leads whose professional indemnity exposure shapes the scheme's protection
Cost control and finance leads who track premiums, excesses, lender conditions and recoveries from underwriters
Course Outline:
Day 1: Construction Hazards and the Scheme Protection Map
Hazard Screening for Building, Civil and Plant Schemes: Physical Damage, Third-Party Injury, Design Error and Late Completion
Insurable Versus Uninsurable Hazards on Site: Fortuity, Wear and Tear, Poor Workmanship and Liquidated Damages
Protection Map Across the Scheme Lifecycle: Tender, Mobilisation, Build, Testing and Defects Notification Period
Interests of Each Party: Employer, Main Contractor, Subcontractors, Lenders and Consultants
Certificate Review of Policies Already Issued for a Live Scheme
Day 2: CAR, EAR and Allied Policies
CAR Wording Anatomy: Material Damage Section, Named Perils Versus All Risks and Joint Names Assured
EAR for Plant and Machinery: Cold Testing, Hot Testing, Commissioning and Trial Operation
Third-Party Section, Cross Liability Clause and Adjacent Structures Exposure
Professional Indemnity for Design-Build: Claims-Made Trigger and Retroactive Date
DSU and ALOP Triggers Tied to Marine Cargo Transit Damage
Day 3: Building and Procuring the Wrap-Up Programme
OCIP Versus CCIP Wrap-Up: Selection Criteria, Enrolled Parties and Excluded Trades
Sum Insured Build-Up from Contract Price, Free-Issue Materials, Consultants' Fees and Debris Removal
Excess Allocation Between Employer, Main Contractor and Subcontractors
Broker Brief and Underwriting Submission Pack for a Building or Plant Scheme
Quotation Comparison Matrix for CAR, EAR and DSU Offers: Wording, Exclusions, Security and Service
Day 4: Conditions of Contract, Bonds and Difficult Incidents
FIDIC Red, Yellow and Silver Book Policy Provisions: Required Policies, Evidence and Remedies for Default
Subcontract Flow-Down, Waiver of Subrogation and Additional Assured Endorsements
Performance Bonds, Advance Payment Guarantees and Retention Bonds Versus Indemnity Policies
Defective Part and Workmanship Exclusions: Resultant Damage and Betterment Positions
Series Events, Flood and Windstorm Excesses and Defects Period Incidents
Day 5: Site Incident Case Work and the CAR and EAR Placement Matrix
Notice Timeline and Evidence Log After a Formwork Collapse
Adjuster Site Visit, Reserve Setting and Reinstatement Cost Agreement
Power Plant Case: Transformer Dropped in Transit and DSU Recovery
CAR and EAR Placement Matrix and Site Incident Protocol Drafting
Peer Panel Defence of the Placement Matrix
Skills You Will Gain:
Hazard-to-Policy Mapping
CAR and EAR Wording Specification
Wrap-Up Programme Structuring
Conditions of Contract Policy Review
Bond and Guarantee Differentiation
Sum Insured and Excess Setting
Site Incident Notification and Evidence Logging
Adjuster Liaison and Reinstatement Negotiation
Why Attend This Course:
Return with a CAR and EAR Placement Matrix and Site Incident Protocol ready for a live or upcoming scheme
Spot, before signature, where the employer's requirements and the policies procured do not match
Handle the first hours and weeks after damage on site with a clear notice, evidence and adjuster routine
Compare practice with site and commercial leads from building, infrastructure, energy and industrial schemes
Conclusion:
Protection for the works holds only when policies are specified from the conditions of contract, procured by the right party and backed by a disciplined response when damage occurs. The course moves from screening site hazards and separating insurable exposures, through CAR, EAR, third-party, professional indemnity, DSU and cargo wordings, to wrap-up programme design, FIDIC policy provisions and bonds. The final day applies these methods to site incident cases and produces a CAR and EAR Placement Matrix with a Site Incident Protocol.
Construction Insurance: Contractors All Risks, Erection All Risks and Site Claims runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.
Looking for training courses in London? CoreConsept Training Center delivers professional training in London across governance, leadership, ESG, project management and digital transformation — open enrolment programmes in central London venues.