This Battery Energy Storage Systems (BESS): Grid-Scale Sizing, Revenue and Safety session in Dubai runs from Monday 1 March to Friday 5 March 2027 (week 9, Q1 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 1 Mar – Friday 5 Mar 2027
Week9 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Battery energy storage systems (BESS) are being tendered and dispatched faster than many owners can write a sound specification, and plants disappoint when MW ratings are confused with MWh, cell fade is left out of the cash-flow model or fire codes are read after the container layout is frozen. This Core Concept course gives electrical engineers, developers and asset owners a working method for choosing a battery chemistry, dimensioning the plant, stacking market revenue and controlling thermal runaway risk. Participants produce a BESS Technical Specification and Investment Workbook.
Course Objectives:
Compare lithium-ion, vanadium flow, pumped hydro and thermal options and choose a chemistry against duration, cycling and location criteria
Specify a BESS from cells and racks through the PCS, battery management system and EMS controller
Dimension a battery plant in MW and MWh using C-rate, depth of discharge, round-trip efficiency, fade and augmentation assumptions
Model stacked revenue across arbitrage, frequency response, resource adequacy payments and renewables firming against cycling limits
Apply NFPA 855 and UL 9540A fire test evidence to container spacing, gas detection, deflagration venting and emergency planning
Define procurement, commissioning and O&M requirements with warranty, availability and state-of-health KPIs for an operating BESS
Target Audience:
Electrical engineers who design and specify battery plants connected to transmission, distribution or generation assets
Developers who screen BESS locations, prepare cash-flow models and take schemes to investment committee
Asset owners accountable for availability, warranty claims and lifetime value of operating battery fleets
Network operations and utility planning staff who contract batteries for balancing, reserves and congestion relief
Owner's engineers and technical advisers who review supplier offers, test reports and EPC submissions for battery plants
Course Outline:
Day 1: Battery Chemistry Choices and Long-Duration Alternatives
Duration Classes: MW Rating, MWh Rating and Hours of Discharge
LFP versus NMC Lithium-Ion Cells: Cycle Life, Thermal Stability and Cost per MWh
Vanadium Redox Flow Batteries: Stack Rating Decoupled from Electrolyte Tank Volume
Pumped Hydro, Compressed Air and Molten Salt Thermal Alternatives Compared
Chemistry Selection Scorecard for a Candidate Battery Location
Day 2: BESS Architecture: Cells, Racks, PCS, BMS and EMS
Cell, Module and Rack Hierarchy Inside Containerised Enclosures
PCS Topologies: Bidirectional Inverters and Medium-Voltage Step-Up Transformers
Battery Management System Functions: Cell Balancing, State of Charge and Protection Limits
EMS Dispatch Logic, Operating Modes and SCADA Interfaces
AC-Coupled versus DC-Coupled Hybrid Configurations with Solar PV Arrays
Day 3: Dimensioning, Fade and Revenue Stacking Models
C-Rate and Usable Depth of Discharge in MW versus MWh Dimensioning
Round-Trip Efficiency, Auxiliary HVAC Load and Point-of-Interconnection Losses
Cycle and Calendar Fade Curves with an Augmentation Schedule
Revenue Stack Workbook: Arbitrage, Frequency Response and Resource Adequacy Payments
Renewables Firming, Curtailment Capture and Network Upgrade Deferral
Day 4: Thermal Runaway, Contracting and Operating Risk
Thermal Runaway Propagation, Off-Gas Composition and Deflagration Venting
NFPA 855 Installation Requirements with UL 9540 Listing and UL 9540A Test Data
Supply-Only versus Full EPC Contracting, Performance Guarantees and LTSA Terms
Factory Acceptance, Site Acceptance and MWh Verification Tests at Commissioning
O&M KPIs: Availability, State of Health, Throughput Counters and Warranty Tracking
Day 5: Modelling Workshop: BESS Technical Specification and Investment Workbook
Scenario Data Pack Review: Load Profile, Price Curves and Interconnection Limits
Dimensioning Workbook: MW, MWh, Duration and Twenty-Year Fade Path
Cash-Flow Workbook with Augmentation Capex and Sensitivity Runs
Fire Strategy, Guarantee Schedule and Test Plan Drafting
Investment Committee Pitch and Peer Technical Challenge
Skills You Will Gain:
Battery Chemistry Selection
BESS Architecture Specification
MW and MWh Dimensioning
Cell Fade Modelling
Market Revenue Stacking
Fire Code Application for Battery Plants
EPC and LTSA Contract Structuring
Battery Fleet Performance Monitoring
Why Attend This Course:
Return with a BESS Technical Specification and Investment Workbook built on realistic price, load and fade data
Challenge supplier offers that quote nameplate MWh without usable throughput, efficiency or end-of-life retention
Link UL 9540A test evidence and NFPA 855 requirements to container layout before the plant design is frozen
Compare battery plant experience with engineers, developers and network staff from utilities, independent producers and industry
Conclusion:
A battery plant earns its keep only when chemistry choice, MW and MWh ratings, revenue assumptions and fire design are settled together rather than in sequence. This course moves from chemistry selection and BESS architecture, through dimensioning, fade and revenue stacking workbooks, to thermal runaway under NFPA 855 and UL 9540A, contracting, commissioning and O&M KPIs. The final day applies that material in a modelling workshop that produces a BESS Technical Specification and Investment Workbook ready for internal engineering and investment review.
Battery Energy Storage Systems (BESS): Grid-Scale Sizing, Revenue and Safety runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.