Well Completion Design: Tubing Stress Analysis, Sand Control and Workover Planning – Paris, 2–6 Aug 2027
DestinationParis
Dates2 – 6 August 2027
Reference363_13148
This session
2–6 Aug 2027
This Well Completion Design: Tubing Stress Analysis, Sand Control and Workover Planning session in Paris runs from Monday 2 August to Friday 6 August 2027 (week 31, Q3 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 2 Aug – Friday 6 Aug 2027
Week31 of 2027
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Well completion design decisions made before the rig arrives fix a well's rate, repair cost and workover frequency for decades: an undersized tubing string, a packer that unseats under thermal load or sand control chosen too late cannot be corrected without a rig. This Core Concept course takes completion, production and drilling engineers through completion type selection, tubing sizing and stress analysis, packers, safety valves, perforating, sand control, intelligent completions and workover planning. Participants build a tubing stress model and write a Completion Program for a deviated case well.
Course Objectives:
Select the completion type and multi-zone configuration for a well from a documented basis of design and offset well records
Screen tubing sizes against inflow, outflow and erosional velocity limits and specify tubing grade and connection
Calculate burst, collapse, axial and triaxial loads for production, shut-in and injection cases, including temperature and ballooning effects
Specify packers, subsurface safety valves, flow control equipment and completion fluids and calculate tubing movement at the packer
Design a perforating strategy and select gravel pack, frac pack or standalone screen sand control for the reservoir
Plan workovers and interventions and write a completion program with running sequence, pressure tests and contingencies
Target Audience:
Completion engineers who design lower and upper completion strings and select downhole equipment
Production engineers who specify tubing, sand control and intervention requirements for producing wells
Drilling engineers who hand wells over for completion and run completion operations from the rig
Well intervention and workover engineers who plan rig and rigless well repairs
Petroleum engineers who review completion designs against reservoir and field development requirements
Course Outline:
Day 1: Completion Architecture Selection and Basis of Design
Completion Basis of Design Document: Reservoir, Fluid and Well Constraints
Completion Type Decision Matrix: Open Hole, Cased and Perforated, and Liner Completions
Single, Dual and Stacked Multi-Zone Completion Configurations
Upper and Lower Completion Interface and Tailpipe Layout
Offset Well Completion Record Review and Lessons-Learned Log
Day 2: Tubing Sizing and Tubing Stress Analysis
Tubing Size Screening from Inflow and Outflow Curves and Erosional Velocity Limits
Burst and Collapse Load Cases for Production, Shut-In and Injection Scenarios
Axial Load Build-Up: Buoyancy, Piston Force and Helical Buckling
Temperature and Ballooning Effects on Tubing Length Change
Triaxial Design Envelope and Design Factor Selection for Tubing Grades and Connections
Day 3: Completion Equipment, Packers, Safety Valves and Fluids
Permanent and Retrievable Packer Selection by Setting Method and Differential Rating
Tubing Movement Calculation at the Packer and Expansion Joint Sizing
Tubing-Retrievable and Wireline-Retrievable Subsurface Safety Valve Setting Depth
Landing Nipples, Sliding Sleeves, Gauge Mandrels and Flow Couplings in the String Layout
Completion and Packer Fluid Selection: Brine Density, Crystallisation and Corrosion Inhibition
Day 4: Perforating, Sand Control and Intelligent Completions
Perforating Strategy: Gun Conveyance, Shot Density, Phasing and Underbalance Design
Sand Production Prediction and Sand Control Method Selection Criteria
Gravel Pack and Frac Pack Design: Gravel Sizing and Pumping Schedule
Standalone Screen Types: Wire-Wrapped, Premium Mesh and Expandable Screens
Intelligent Completion Overview: Inflow Control Devices, Interval Control Valves and Downhole Gauges
Day 5: Workover Planning and Completion Program Build
Well Kill Method and Intervention Technique Choice: Wireline, Coiled Tubing and Snubbing
Completion Running Sequence, Pressure Test Programme and Contingency Steps
Tubing Stress Model Build for a Deviated Producer Case Well
Completion Program Drafting and Peer Design Review
Skills You Will Gain:
Completion Type Selection
Tubing Load Case Analysis
Triaxial Stress Evaluation
Tubing Movement Calculation
Perforating Programme Design
Sand Control Method Selection
Workover Scope Planning
Completion Program Writing
Why Attend This Course:
Return with a Completion Program and tubing stress model for a deviated case well, already challenged in a peer design review
Check tubing designs against every load case, not only installation, before tubulars and equipment are ordered
Reduce early workovers by matching packers, safety valves, sand control and fluids to the full producing life of the well
Compare completion practice with engineers from operators and service companies working on onshore and offshore oil and gas wells
Conclusion:
A completion string has to survive every load it will see, from running and pressure testing to production, shut-in, stimulation and later workover. The course moves from completion type selection and basis of design through tubing sizing and triaxial stress analysis, packers, safety valves and completion fluids, to perforating, sand control and intelligent completions. The final day applies these methods to workover planning and a deviated case well, producing a tubing stress model and a Completion Program ready for peer design review.
Well Completion Design: Tubing Stress Analysis, Sand Control and Workover Planning runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.