Construction Equipment Management: Earthmoving Productivity, Fleet Matching and Machine Hour Cost – Dubai, 8–12 Mar 2027
DestinationDubai
Dates8 – 12 March 2027
Reference378_13354
This session
8–12 Mar 2027
This Construction Equipment Management: Earthmoving Productivity, Fleet Matching and Machine Hour Cost session in Dubai runs from Monday 8 March to Friday 12 March 2027 (week 10, Q1 2027). It is the 2nd of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 8 Mar – Friday 12 Mar 2027
Week10 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Construction equipment management often fails on earthworks and civil projects because machines are chosen by habit, excavators and haul trucks are mismatched, productivity is guessed rather than estimated from cycle times, and plant sits idle or broken while the schedule slips. This Core Concept course trains contractor equipment planners, plant managers and project engineers to select and size an earthmoving fleet, estimate output per hour, price owning and operating cost per machine hour, decide between buying, leasing and renting, and track utilisation with telematics. Participants build an Equipment Plan and Cost Model for a project of their own.
Course Objectives:
Classify earthmoving and construction machines by function and match each type to soil, haul distance and site conditions
Estimate excavator, loader, dozer and haul truck productivity from cycle times, bucket fill, swell and job efficiency factors
Balance a loading unit with its haul fleet using match factor analysis and size the fleet to a required daily production
Calculate owning and operating cost per machine hour and compare buy, lease and rent options for a given project duration
Load equipment onto the project schedule, level plant resources and set mobilisation and demobilisation dates
Track plant utilisation, availability and fuel use with telematics data and act on idle time and breakdown trends
Target Audience:
Professionals who plan and allocate earthmoving plant to contractor projects
Professionals who run plant yards, equipment pools and site workshops for civil contractors
Project and site engineers who estimate earthworks quantities, durations and equipment output
Estimating and tendering staff who price plant cost into bids for roads, infrastructure and site preparation
Project controls staff who schedule resources and report equipment cost against budget
Owner-side and consultant engineers who review contractor equipment plans and productivity claims
Course Outline:
Day 1: Earthmoving and Construction Plant Types and Applications
Hauling Units: Rigid and Articulated Dump Trucks, Road Tippers and Haul Road Limits
Mobile and Crawler Cranes at Overview: Duty Charts, Radius and Site Selection Factors
Material Properties for Plant Selection: Bank, Loose and Compacted Volumes and Swell Factors
Current Fleet Register and Plant Allocation Snapshot Template
Day 2: Productivity Estimating and Fleet Matching Models
Cycle Time Build-Up: Load, Haul, Dump, Return and Spot Times
Excavator and Loader Output: Bucket Capacity, Fill Factor and Job Efficiency Correction
Dozer and Grader Production: Blade Capacity, Push Distance and Pass Counts
Match Factor Method for Loader and Haul Truck Fleet Balancing
Mass Haul Diagram: Cut and Fill Balance, Haul Distance and Borrow and Waste Decisions
Day 3: Owning and Operating Cost and Acquisition Decisions
Owning Cost per Machine Hour: Depreciation, Interest, Insurance and Storage
Operating Cost per Machine Hour: Fuel, Lubricants, Tyres or Undercarriage, Wear Parts and Operator
Buy, Lease and Rent Decision Model Using Project Duration and Expected Utilisation
Economic Life and Replacement Timing From Cumulative Cost per Hour Curves
Internal Plant Hire Rates and Cost Recovery to Project Budgets
Day 4: Equipment Scheduling, Telematics and Plant Availability Risks
Equipment Resource Loading and Levelling in the Project Schedule
Mobilisation, Demobilisation and Transfer Planning Between Sites
ISO/TS 15143-3:2016 Telematics Data: Engine Hours, Idle Time, Fuel Burn and Fault Codes
Plant Availability, Utilisation and Mean Time Between Breakdowns Tracking on Site
Equipment Safety at Overview: Pre-Start Checks, Blind Spots, Exclusion Zones and Spotter Rules
Day 5: Guided Earthworks Cases and the Equipment Plan and Cost Model
Guided Case: Road Embankment Earthworks Fleet Sizing From a Mass Haul Diagram
Guided Case: Site Preparation Package Rent Versus Own Decision for a Contractor
Equipment Plan and Cost Model Build for a Participant Project
Plant Performance Dashboard: Production per Hour, Cost per Cubic Metre and Utilisation
Equipment Plan Presentation and Peer Challenge Panel
Skills You Will Gain:
Plant Type Selection
Cycle Time Analysis
Fleet Match Factor Calculation
Mass Haul Planning
Machine Hour Costing
Plant Acquisition Appraisal
Equipment Resource Scheduling
Telematics Utilisation Analysis
Why Attend This Course:
Return with an Equipment Plan and Cost Model built on a project, quantities and machines of your own
Challenge an optimistic productivity figure or a hire quotation with worked cycle time and cost per hour sheets
Spot over-trucked or under-trucked loading operations and idle plant before they erode margin
Compare plant practice with contractors and engineers working on roads, site preparation, utilities and infrastructure works
Conclusion:
Earthworks margins depend on putting the right machines on site, in the right numbers, for the right period. The course moves from plant types and material behaviour, through productivity estimating, cycle times, fleet matching and mass haul planning, to owning and operating cost, acquisition decisions and replacement timing, then to equipment scheduling, telematics, availability tracking and equipment safety. The final day applies those methods to road and site preparation cases and produces an Equipment Plan and Cost Model for each participant's project.
Construction Equipment Management: Earthmoving Productivity, Fleet Matching and Machine Hour Cost runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.