Land Surveying for Construction: Total Station, GNSS RTK and Setting Out – London, 21–25 Dec 2026
DestinationLondon
Dates21 – 25 December 2026
Reference408_13723
This session
21–25 Dec 2026
This Land Surveying for Construction: Total Station, GNSS RTK and Setting Out session in London runs from Monday 21 December to Friday 25 December 2026 (week 52, Q4 2026). It is the only date in London in 2026, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 21 Dec – Friday 25 Dec 2026
Week52 of 2026
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Land surveying errors on construction sites rarely show at the instrument: a control point disturbed by plant, an RTK fix accepted without a check shot, or a level loop never closed ends up as a column off grid, a pipe laid against its fall or an earthwork claim nobody can verify. This Core Concept course gives site and survey staff a field method for land surveying on projects, from coordinate frames and control networks through total station traversing, levelling and GNSS RTK to setting out, as-built checks and volume computation. Participants compile a Site Survey Control and Setting-Out File.
Course Objectives:
Establish and densify a site control network with monumented points, coordinate listings and a documented height reference
Operate a total station for traverses, resection and free stationing, and adjust closing traverses by the Bowditch rule and least squares
Run differential and trigonometric levelling to transfer heights, close level loops and apply curvature and refraction corrections
Observe GNSS RTK and network RTK positions with initialisation, check shots and quality indicators that prove each fix
Set out building grids, road alignments and utility lines from design coordinates and record tolerance checks
Produce as-built and topographic surveys, compute cut and fill volumes and assemble a Site Survey Control and Setting-Out File
Target Audience:
Site engineering staff who set out foundations, structures and services from design coordinates
Survey engineering staff who design site control, check contractor survey work and sign off as-built records
Survey technicians who operate total stations, levels and GNSS receivers in daily field work
Infrastructure field staff who stake road, pipeline and drainage alignments and check levels and falls
Quantity and earthworks staff who rely on survey data for cut, fill and stockpile measurement
Course Outline:
Day 1: Spatial Reference, Site Grids and Control Network Planning
Geodetic Datum, Ellipsoid and Map Projection Concepts for Site Coordinates
Grid Scale Factor, Ground-to-Grid Distance Reduction and Local Site Grids
Ellipsoidal Height, Geoid Model and Orthometric Height Relationships
Primary and Secondary Control Point Layout, Monumentation and Witness Diagrams
Current-State Review of a Project Control Register and Benchmark Schedule
Day 2: Total Station Traversing and Levelling Methods
Total Station Set-Up: Centring, Levelling, Face Left and Face Right Observations
EDM Distance Measurement, Prism Constants, Reflectorless and Robotic Modes
Closed and Link Traverse Field Procedure with Angular Misclosure Checks
Differential Levelling: Backsight, Foresight, Rise and Fall and Loop Closure
Trigonometric Height Transfer with Curvature and Refraction Correction
Day 3: GNSS RTK Observation and Construction Setting Out
RTK Base and Rover Configuration, Radio and Correction Links
Network RTK and Virtual Reference Station Corrections for Wide Sites
Integer Ambiguity Fix, Satellite Geometry, Multipath and Check Shot Routines
Building Setting Out: Grid Lines, Column Centres, Offset Pegs and Profile Boards
Road and Utility Stakeout: Chainage, Offset, Invert Levels and Gradient Checks
Day 4: Survey Errors, Adjustment and Earthwork Quantities
Gross, Systematic and Random Error Sources in Field Survey Data
Bowditch Compass Rule Traverse Adjustment and Coordinate Misclosure Ratio
Least Squares Network Adjustment, Residuals and Error Ellipses at Practitioner Level
Surface Models for Cut and Fill: Grid, Cross-Section and TIN Volume Methods
As-Built Tolerance Checks, Deviation Reports and Resurvey Triggers
Day 5: Field Data Processing, Emerging Capture Tools and the Setting-Out File Build
Field Code Lists, Raw Data Download and Point Processing into CAD and GIS Layers
Drone Photogrammetry and Terrestrial Laser Scanning for Site Surveys at Overview
Case Build: Traverse and Level Network Adjustment from Real Site Observations
Case Build: Stockpile and Bulk Excavation Volume Reconciliation Between Two Surveys
Site Survey Control and Setting-Out File Assembly and Peer Review
Skills You Will Gain:
Site Control Network Design
Total Station Field Operation
Level Loop Closure
RTK Fix Quality Assessment
Construction Stakeout
Traverse Adjustment
Earthwork Volume Computation
Survey Data Processing
Why Attend This Course:
Return with a Site Survey Control and Setting-Out File holding control listings, adjusted traverse and level results, stakeout records and a volume report
Catch disturbed control, bad RTK fixes and unclosed level runs before they turn into rework on structures, roads and pipelines
Defend earthwork quantities and as-built positions with adjusted, checked survey data rather than single unverified shots
Compare field survey practice with engineers and technicians from building, road, utility and industrial projects
Conclusion:
Construction work lands in the right place only when survey control, measurement and checks hold together from the first benchmark to the final as-built. The week moves from coordinate frames, heights and control layout through total station traversing, levelling and GNSS RTK to building, road and utility stakeout, then error handling, traverse and network adjustment, and cut and fill volumes. The final day processes field data, reviews drone and scanning capture, and builds a Site Survey Control and Setting-Out File for use on live projects.
Land Surveying for Construction: Total Station, GNSS RTK and Setting Out runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.
Looking for training courses in London? CoreConsept Training Center delivers professional training in London across governance, leadership, ESG, project management and digital transformation — open enrolment programmes in central London venues.