Building Commissioning: MEP Functional Testing, Retro-Commissioning and Handover – London, 28 Jun – 2 Jul 2027
DestinationLondon
Dates28 June – 2 July 2027
Reference428_13942
This session
28 Jun – 2 Jul 2027
This Building Commissioning: MEP Functional Testing, Retro-Commissioning and Handover session in London runs from Monday 28 June to Friday 2 July 2027 (week 26, Q2 2027). It is the only date in London in 2027, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 28 Jun – Friday 2 Jul 2027
Week26 of 2027
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Building commissioning is where owners discover whether chillers, air handlers, switchboards, fire alarms and controls actually work together as the design intended. When the Owner's Project Requirements are vague, test scripts are written late and the issues log is left open, buildings reach occupancy with hot zones, nuisance alarms and untrained operators. This Core Concept course builds practical skill in the whole-building commissioning process for MEP systems, from OPR and Basis of Design to functional performance testing, seasonal checks and retro-commissioning. Participants produce a Building Commissioning Plan and Functional Test Pack.
Course Objectives:
Define commissioning scope, team roles and deliverables for a new or existing building using the ASHRAE Guideline 0 process
Write and review Owner's Project Requirements and Basis of Design documents that give the design team measurable acceptance criteria
Review design documents and equipment submittals for commissionability, access, controls points and testability
Prepare pre-functional checklists and functional performance test scripts for HVAC, electrical, fire and life safety and BMS systems
Verify TAB reports, witness integrated systems tests and drive the commissioning issues log to closure
Plan operator training, systems manual handover, seasonal testing and retro-commissioning of occupied buildings
Target Audience:
Mechanical and electrical engineers responsible for designing or installing building services that must pass acceptance
Commissioning providers responsible for planning, witnessing and reporting on building systems tests
Facility and operations staff responsible for accepting, running and maintaining handed-over buildings
Owner-side project engineers responsible for construction quality and handover of new facilities
Controls and BMS technicians responsible for sequences of operation, trending and point-to-point checks
Course Outline:
Day 1: Commissioning Process, Roles and Owner Requirements
Commissioning Types Compared: New Construction Cx, Retro-Commissioning, Re-Commissioning and Ongoing Cx
Commissioning Team Structure: Owner, Commissioning Provider, Designer, Contractor and Operator Roles
Owner's Project Requirements Workshop Template and Measurable Acceptance Criteria
Basis of Design Document Structure and Traceability to the OPR
Commissioning Maturity Assessment of a Current Project Portfolio
Day 2: Commissioning Standards, Plans and Specifications
ASHRAE Guideline 0 Commissioning Process Phases from Pre-Design to Occupancy
ASHRAE Standard 202 Minimum Requirements and ASHRAE Guideline 1.1 for HVAC&R Systems
Commissioning Plan Contents: Schedule, Systems List, Communication Protocol and Sampling Strategy
Division 01 Commissioning Specification Clauses and Contractor Cx Responsibilities
Design Review and Submittal Review Checklists for Commissionability and Maintainability
Day 3: Pre-Functional Checks, Functional Testing and TAB
Pre-Functional Checklists for Chillers, Air Handling Units, Pumps and Fan Coil Units
Functional Performance Test Scripts: Modes, Setpoints, Failure Responses and Pass Criteria
TAB Report Verification: Air and Water Flow Readings and Spot-Check Sampling
BMS Point-to-Point Checks, Sequence of Operations Testing and Trend Log Analysis
Electrical Systems Functional Tests: Generator Transfer, UPS Runtime and Lighting Controls
Day 4: Integrated Systems Testing, Issues and Existing Buildings
Integrated Systems Testing: Fire Alarm, Smoke Control, Lifts and HVAC Shutdown Cause and Effect Matrix
ASHRAE Guideline 1.5 Smoke Control Commissioning at Overview
Commissioning Issues Log: Severity Rating, Ownership, Retest and Closure Rules
Seasonal and Deferred Testing Plans for Peak Cooling and Part-Load Conditions
Retro-Commissioning Under ASHRAE Standard 230 and Guideline 0.2: Investigation and Low-Cost Measures
Day 5: Handover, Green Building Links and Commissioning Case Work
Systems Manual and O&M Documentation Handover per ASHRAE Guideline 1.4
Operator Training Plan, Attendance Records and Warranty Phase Review
Commissioning Requirements in Green Building Rating Systems and Envelope Cx under NIBS Guideline 3 at Overview
Hospital and Office Tower Cases: Failed Functional Tests and Late Handover Recovery
Building Commissioning Plan and Functional Test Pack Drafting and Peer Review
Skills You Will Gain:
Owner Requirements Definition
Commissionability Review
Functional Test Scripting
TAB Data Verification
Controls Sequence Validation
Integrated Systems Testing
Issues Log Management
Retro-Commissioning Investigation
Why Attend This Course:
Return with a Building Commissioning Plan and Functional Test Pack prepared for a building from your own project or estate
Catch missing controls points, inaccessible dampers and untestable designs at review stage rather than during occupancy
Hand over buildings with trained operators, a complete systems manual and an issues log closed to agreed rules
Compare commissioning practice with MEP and facilities peers from healthcare, commercial, hospitality, education and data centre projects
Conclusion:
Buildings perform as intended when commissioning starts with clear owner requirements and ends with trained operators and closed issues. The one week move from commissioning roles, OPR and Basis of Design, through ASHRAE Guideline 0 and Standard 202 plans and specifications, to pre-functional checklists, functional tests, TAB verification and BMS sequence checks. Integrated systems testing, issues management, seasonal testing and retro-commissioning follow, before case work produces a Building Commissioning Plan and Functional Test Pack ready for the next project.
Building Commissioning: MEP Functional Testing, Retro-Commissioning and Handover runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.
Looking for training courses in London? CoreConsept Training Center delivers professional training in London across governance, leadership, ESG, project management and digital transformation — open enrolment programmes in central London venues.