Drilling Fluids and Well Cementing: Mud Testing, Slurry Design and Cement Placement – Dubai, 15–19 Feb 2027
DestinationDubai
Dates15 – 19 February 2027
Reference472_14424
This session
15–19 Feb 2027
This Drilling Fluids and Well Cementing: Mud Testing, Slurry Design and Cement Placement session in Dubai runs from Monday 15 February to Friday 19 February 2027 (week 7, Q1 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 15 Feb – Friday 19 Feb 2027
Week7 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Drilling fluids and well cementing decide whether a hole section stays open and whether the casing behind it isolates each zone. Poorly tested mud leads to swelling shale, thick filter cake, losses and stuck pipe; a slurry mixed without lab data, centralisation or spacer design leaves channels, gas migration and costly squeeze work. This Core Concept course trains mud and cementing practitioners to formulate, test and troubleshoot both fluids against API recommended practices. Participants produce a Mud Programme and Casing Cement Job Design for a realistic well.
Course Objectives:
Formulate water-based, oil-based and synthetic-based mud systems with additives matched to formation, temperature and hole-section targets
Run and interpret API field and laboratory tests on drilling fluid rheology, filtration, solids and oil-water ratio and act on the results
Specify solids control, shale inhibition and lost circulation treatments that keep mud properties within programme limits
Design cement slurries by class and additive package and verify them with thickening time, compressive strength and fluid-loss tests
Plan a primary cement job with centraliser placement, spacer hierarchy and displacement hydraulics that achieve zonal isolation
Select remedial squeeze or plug methods and read CBL and VDL results to judge cement placement quality
Target Audience:
Mud engineering functions that formulate, test and maintain drilling fluid properties at the rigsite and in the laboratory
Cementing engineering functions that design slurries, run laboratory tests and write pumping schedules
Drilling engineering functions that write fluid and cement sections of the well programme
Rig-based supervision functions that check daily mud reports and oversee cement jobs
Service company technical functions that support operators with fluid and cement products
Course Outline:
Day 1: Drilling Fluid Functions, Mud Systems and Additive Chemistry
Drilling Fluid Functions: Hydrostatic Control, Cuttings Transport, Suspension and Bit Cooling
Water-Based Mud Systems: Bentonite, Polymer and Inhibitive Formulations
Oil-Based and Synthetic-Based Mud: Oil-Water Ratio, Emulsifiers and Electrical Stability
Barite Material Balance for Mud Weight-Up and Dilution Calculations
Day 2: Rheology Models, API Mud Testing and Well Cement Classes
Bingham Plastic, Power Law and Herschel-Bulkley Rheology Models with Gel Strength Profiles
API RP 13B-1 and 13B-2 Field Tests: Mud Balance, Marsh Funnel and Six-Speed Viscometer
API RP 13I Laboratory Tests: HPHT Filtration, Retort Analysis and Methylene Blue Capacity
API Specification 10A Well Cement Classes with Class G and Class H Selection
Cement Additive Families: Retarders, Accelerators, Fluid-Loss Agents and Extenders
Day 3: Wellbore Stability, Solids Control and Slurry Design
Filter Cake Quality and Shale Hydration Control for Wellbore Stability
Solids Control and Drilling Waste Handling: Shakers, Hydrocyclones, Centrifuges and Cuttings Disposal at Overview
Cement Slurry Design Worksheet: Density, Yield and Mix-Water Requirement
API RP 10B-2 Laboratory Testing: Thickening Time, Compressive Strength, Free Fluid and Fluid Loss
Primary Cementing Job Layout: Float Equipment, Wiper Plugs and Potential Flow Zone Isolation per API RP 65-2
Day 4: Lost Circulation, Mud Removal, Placement Hydraulics and Remedial Cementing
Lost Circulation Classification and Loss Control Material Pill Design
Centraliser Placement and Standoff Calculation per API RP 10D-2
Mud Removal Sequence: Spacer and Wash Rheology Hierarchy and Contact Time
Cement Placement Hydraulics: Displacement Rate, Equivalent Circulating Density and U-Tubing Checks
Squeeze Cementing, Balanced Cement Plugs and CBL and VDL Interpretation at Overview
Day 5: Capstone: Mud Programme and Casing Cement Job Design
Case Exercise: Hole-Section Mud Programme with Property Targets and Test Frequency
Case Exercise: Mud Contamination Troubleshooting from Daily Mud Check Reports
Case Exercise: Casing Cement Job with Slurry, Spacer and Pumping Schedule
Case Exercise: Post-Job Review of Pressure Chart and Bond Log Against Job Objectives
Mud Programme and Casing Cement Job Design Presentation and Peer Review
Skills You Will Gain:
Mud System Formulation
Drilling Fluid Rheology Testing
Solids Control Management
Lost Circulation Treatment
Cement Slurry Design
Cement Laboratory Testing
Mud Removal and Centralisation Planning
Cement Bond Log Reading
Why Attend This Course:
Return with a Mud Programme and Casing Cement Job Design built on a realistic well during the course
Read a daily mud check or a lab cement report and know which property to correct and with which additive
Reduce channelling, gas migration and squeeze repairs by linking spacer, centraliser and displacement choices
Compare fluid and cement practice with engineers from operators, drilling contractors and service companies
Conclusion:
Mud and cement are both engineered fluids, and each only performs when its formulation, testing and placement are planned together. The course moves from mud functions, systems and additive chemistry through rheology models and API field and laboratory testing, to well cement classes, additives and slurry design, then to lost circulation, mud removal, centralisation, placement hydraulics, squeeze work and bond logs. The final day turns this into a Mud Programme and Casing Cement Job Design ready for technical review.
Drilling Fluids and Well Cementing: Mud Testing, Slurry Design and Cement Placement runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.