Offshore Wind Energy: Site Screening, Fixed and Floating Foundations, Installation and LCOE – Paris, 16–20 Nov 2026
DestinationParis
Dates16 – 20 November 2026
Reference540_17187
This session
16–20 Nov 2026
This Offshore Wind Energy: Site Screening, Fixed and Floating Foundations, Installation and LCOE session in Paris runs from Monday 16 November to Friday 20 November 2026 (week 47, Q4 2026). It is the only date in Paris in 2026, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 16 Nov – Friday 20 Nov 2026
Week47 of 2026
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Offshore wind energy projects commit capital years before first power, so a wrong call on water depth, foundation type, vessel availability or discount rate can erase a project's margin long before construction starts. This Core Concept course takes developers, engineers, project managers and investors, including oil and gas professionals moving into renewables, through the offshore wind value chain: site and seabed data, turbine sizing, fixed and floating support structures, cables and substations, installation, O&M access and cost of energy. Participants build an Offshore Wind Concept and LCOE Screening Report for a case site.
Course Objectives:
Screen offshore wind sites against water depth, distance to shore, shipping, environmental and grid landfall constraints using metocean and seabed survey data
Estimate net annual energy for an offshore array by applying wake, electrical and availability losses to a selected turbine size
Select between monopile, jacket, gravity base, suction caisson and floating spar, semi-submersible or tension-leg concepts for a given seabed and depth
Specify inter-array and export cable routes, offshore substation needs, installation vessels and marshalling port requirements for a wind farm layout
Plan construction risk controls and an O&M access strategy using crew transfer vessels, service operation vessels and major component exchange options
Calculate a screening LCOE with capex, opex, capacity factor and discount rate sensitivity and explain the project finance view of it
Target Audience:
Project developers who screen seabed lease areas and prepare offshore wind projects for investment decisions
Engineers who assess metocean data, foundations, cables and electrical systems for offshore wind concepts
Project managers who plan fabrication, installation campaigns, vessels and port logistics for offshore construction
Investors, lenders and commercial analysts who review cost of energy, risk and technical due diligence findings
Oil and gas professionals moving marine, subsea or project experience into offshore wind roles
Course Outline:
Day 1: Offshore Wind Market, Value Chain and Site Screening
Offshore Wind Value Chain and Project Phases: Developer, Turbine Supplier, Fabricator, Installer and Operator Roles
Site Selection Constraint Mapping: Water Depth, Distance to Shore, Shipping Lanes and Grid Landfall
Metocean Campaign Scope: Floating Lidar Buoys, Wave Buoys and Current Profilers
Seabed Survey Sequence: Bathymetry, Sub-Bottom Profiling and Cone Penetration Tests
Environmental and Stakeholder Screening: Seabirds, Piling Noise on Marine Mammals and Fisheries Coexistence
Day 2: Energy Yield, Turbine Sizing and Support Structure Concepts
Offshore Energy Yield Chain: Gross Output, Array Wake Losses, Electrical Losses and Availability
Offshore Turbine Sizing: Rotor Diameter, Rated Power, Hub Height and Direct-Drive versus Geared Nacelles
Fixed-Bottom Foundation Selection Matrix: Monopile, Jacket, Gravity Base and Suction Caisson under DNV-ST-0126
Floating Platform Archetypes: Spar-Buoy, Semi-Submersible and Tension-Leg Platform Compared
Station-Keeping Options: Catenary Chain, Taut Synthetic Rope and Tension-Leg Tethers
Day 3: Electrical Infrastructure, Installation Vessels and Marine Logistics
Inter-Array Cable Layout: String Configuration, Burial Assessment and Cable Protection Systems
Export Transmission Choice: HVAC versus HVDC Cables and Landfall Horizontal Directional Drilling
Offshore Substation and Converter Platform Topsides Arrangement
Project Finance Overview: Revenue Contracts, Cash-Flow Debt Sizing and Lender Technical Due Diligence
Day 5: Capstone: Offshore Wind Concept and LCOE Screening
Case Site Brief Review: Metocean Records, Seabed Survey Results and Grid Connection Point
Fixed-Bottom versus Floating Concept Scoring for the Case Site
Turbine, Array Layout and Export Route Selection with Net Yield Estimate
LCOE Screening Model with Capex, Opex and Discount Rate Sensitivity Tornado
Concept and LCOE Screening Report Presentation and Investment Panel Challenge
Skills You Will Gain:
Offshore Site Constraint Analysis
Metocean and Seabed Data Interpretation
Offshore Array Yield Estimation
Support Structure Concept Selection
Cable and Substation Scoping
Installation Vessel Planning
O&M Access Planning
Cost of Energy Modelling
Why Attend This Course:
Return with an Offshore Wind Concept and LCOE Screening Report built for a case site with real survey-style data
Question consultant yield figures, foundation choices and vessel plans before they drive an investment decision
Translate oil and gas marine, subsea and project experience into the vocabulary offshore wind developers and lenders use
Compare fixed-bottom and floating options with peers from developers, contractors, utilities and investment teams
Conclusion:
Offshore wind projects succeed when site data, technology choices, construction planning and cost of energy are assessed together rather than in separate silos. The one week move from the value chain, site screening and seabed and metocean surveys, through energy yield, turbine sizing and fixed and floating support structures, to cables, substations, installation vessels and ports, then construction risk, O&M access, LCOE and project finance. The final day produces an Offshore Wind Concept and LCOE Screening Report ready for panel challenge.
Offshore Wind Energy: Site Screening, Fixed and Floating Foundations, Installation and LCOE runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.