Infection Control Risk Assessment (ICRA) for Healthcare Construction and Renovation – Dubai, 6–10 Sep 2027
DestinationDubai
Dates6 – 10 September 2027
Reference566_17468
This session
6–10 Sep 2027
This Infection Control Risk Assessment (ICRA) for Healthcare Construction and Renovation session in Dubai runs from Monday 6 September to Friday 10 September 2027 (week 36, Q3 2027). It is the only date in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 6 Sep – Friday 10 Sep 2027
Week36 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Infection control risk assessment (ICRA) for healthcare construction and renovation is often left to a signed form, while demolition dust, wet ceiling voids, depressurised corridors and stagnant pipework expose immunocompromised patients to fungal spores and waterborne organisms. This Core Concept course trains infection prevention, facilities engineering, project and contractor teams to classify works on the ICRA matrix, design containment, hold negative pressure with HEPA filtration, manage water and HVAC interfaces, and enforce permits and daily rounds. Participants complete an ICRA and Construction Infection Control Plan for a case hospital renovation.
Course Objectives:
Explain how demolition, drilling, ceiling access and water outages release Aspergillus spores, dust and waterborne organisms into patient areas
Classify a construction project by activity type and patient risk group on the ICRA matrix and assign the matching precaution class
Specify containment barriers, anterooms, negative pressure and portable HEPA filtration for works next to occupied clinical areas
Plan dust suppression, moisture control, water system flushing and HVAC shutdowns so that clinical services stay protected during works
Operate the ICRA permit, pre-work sign-off, daily inspection rounds and contractor induction as one controlled process
Respond to a containment breach or a construction-linked infection signal with stop-work, investigation and corrective action
Target Audience:
Infection prevention teams who assess the risk of building works and approve precaution classes
Hospital facilities and engineering managers responsible for ventilation, water systems and maintenance works in occupied buildings
Healthcare project managers who plan renovation phasing, budgets and contractor scope
Contractor site supervisors accountable for barrier installation, dust control and workforce conduct inside hospitals
Environmental services managers who clean work zones and surrounding clinical areas during and after works
Unit and department managers who coordinate patient relocation and clinical service continuity during works
Course Outline:
Day 1: Why Construction Creates Infection Risk in Healthcare Buildings
Construction-Linked Outbreak Patterns: Aspergillus, Mucorales and Waterborne Organisms
Dust and Spore Release Mechanisms in Demolition, Drilling and Above-Ceiling Access
Moisture Intrusion, Wet Building Materials and Mould Growth Timelines
High-Risk Patient Groups: Transplant, Severely Neutropenic and Corticosteroid-Treated Patients
Estate Walk-Down Checklist for Planned, Reactive and Minor Works
Day 2: The ICRA Matrix, Precaution Classes and Guidance Frameworks
Environmental Infection Control Guidelines for Healthcare Facilities: Construction Provisions
Construction Activity Types A to D: Inspection, Small-Scale, Heavy Dust and Major Demolition Works
Patient Risk Group Mapping: Low, Medium, High and Highest-Risk Areas
ICRA Matrix Reading and Precaution Classes I to IV with Required Controls
Pre-Construction Risk Assessment Scope: Adjacent Rooms, Floors Above and Below and Air Paths
Day 3: Containment, Pressure and Dust Control on Live Wards
Barrier Design: Portable Containment Cubes, Hard-Wall Enclosures and Sealed Penetrations
Anteroom Layout, Sticky Mats and Protective Clothing Changes at the Work Zone Exit
Negative Pressure Set-Up with Differential Pressure Monitors and Exhaust Routing
Portable HEPA Air Scrubber Selection, Air Changes and Filter Change Logs
Dust Suppression, Debris Removal Routes and Covered Waste Carts
Day 4: Water, HVAC Interfaces, Permits and Breach Response
Water Outage Planning, Dead-Leg Removal and Post-Works Flushing Before Handover
HVAC Shutdown Requests, Duct Sealing and Air Handling Restart Checks
ICRA Permit Workflow: Sign-Off by Infection Prevention, Facilities and the Contractor
Contractor Induction, Competence Records and Non-Conformance Escalation
Containment Breach Stop-Work Protocol and Construction-Linked Infection Surveillance Review
Day 5: Inspection Walkthrough and the Construction Infection Control Plan
Daily ICRA Round Walkthrough Using a Scored Containment Checklist
Case Study: Oncology Ward Refurbishment Next to an Occupied Bone Marrow Transplant Unit
Case Study: Outpatient Clinic Fit-Out with a Planned Domestic Water Shutdown
Stakeholder Communication Plan: Clinical Teams, Patients, Facilities and Contractors
ICRA and Construction Infection Control Plan Build and Panel Review
Skills You Will Gain:
Construction Infection Hazard Recognition
ICRA Matrix Classification
Containment Barrier Specification
Negative Pressure Verification
HEPA Filtration Planning
Construction Water and HVAC Interface Planning
ICRA Permit Administration
Containment Breach Investigation
Why Attend This Course:
Leave with a completed ICRA and Construction Infection Control Plan for a case renovation, ready to adapt to your next project
Agree precaution classes with engineers and contractors using one shared matrix instead of case-by-case negotiation
Spot failing barriers, reversed airflow and dusty exit routes on a site round before patients are exposed
Compare construction infection control practice with hospital, clinic and long-term care teams from several organisations
Conclusion:
Building works in occupied healthcare facilities stay safe when risk is classified before the first panel is removed and controls are checked every day until handover. The course moves from how construction releases spores, dust and waterborne organisms, through the ICRA matrix and precaution classes, to containment, negative pressure, HEPA filtration and dust control, then to water and HVAC interfaces, permits, contractor oversight and breach response. The final day applies this in an inspection walkthrough and produces an ICRA and Construction Infection Control Plan.
Infection Control Risk Assessment (ICRA) for Healthcare Construction and Renovation runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.