Produced Water Treatment and Reinjection: De-Oiling, Injection Water Quality and Injectivity – Dubai, 31 May – 4 Jun 2027
DestinationDubai
Dates31 May – 4 June 2027
Reference574_17556
This session
31 May – 4 Jun 2027
This Produced Water Treatment and Reinjection: De-Oiling, Injection Water Quality and Injectivity session in Dubai runs from Monday 31 May to Friday 4 June 2027 (week 22, Q2 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 31 May – Friday 4 Jun 2027
Week22 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Produced water treatment decides whether a maturing oil field keeps its injectors open: rising water cut overloads de-oiling vessels, oil-in-water creeps above target, suspended solids and bacteria plug the sandface and injection pressure climbs until wells are shut in or water is dumped at higher cost. This Core Concept course gives engineers the methods to characterise produced water, choose between reinjection, disposal and reuse, size de-oiling and filtration stages, set injection water specifications and trace injectivity loss. Participants produce a Produced Water Treatment and Reinjection Train Design for a case field.
Course Objectives:
Quantify produced water volumes, water cut forecasts and composition, including dispersed oil, dissolved solids, heavy metals and NORM, for each source feeding the water system
Select a water management route of reinjection for pressure support, disposal injection or reuse and discharge by comparing volume, quality and cost
Size and operate skim tanks, deoiling hydrocyclones, gas flotation units and nutshell or media filters to meet oil-in-water and solids targets
Set injection water quality specifications for oil-in-water, total suspended solids, particle size, dissolved oxygen and sulphate-reducing bacteria and prepare seawater by filtration, deaeration and sulphate removal
Diagnose injectivity decline from water quality, compatibility and scaling data using Hall plots, core flood evidence and membrane filtration tests
Design a produced water treatment and reinjection train with a sampling and measurement plan for a case field
Target Audience:
Production engineering functions responsible for water cut, water handling capacity and injector availability
Facilities and process engineering functions responsible for de-oiling, filtration and deaeration equipment performance
Water treatment functions responsible for injection water quality, sampling and laboratory measurement
Reservoir and injection surveillance functions responsible for voidage targets, injectivity and disposal well capacity
Operations functions responsible for running water plants, injection pumps and disposal systems on shift
Course Outline:
Day 1: Produced Water Sources, Volumes and Management Strategy
Formation, Condensed and Injected Water Breakthrough as Produced Water Sources
Water Cut Forecast and Water-to-Oil Ratio Profiles over Field Life
Produced Water Composition Sheet: Dispersed Oil, Dissolved Organics, TDS, Heavy Metals and NORM
Management Route Screening: Reinjection for Pressure Support, Disposal Injection, Reuse and Discharge
Water Balance Block Diagram from Separator Water Outlet to Injection Wellhead
Day 2: Primary and Secondary De-Oiling and Solids Removal
Oil Droplet Size Distribution and Stokes Law Separation Basis
Skim Tank and Gravity Settling Vessel Retention Time and Oil Recovery
Deoiling Hydrocyclone Liner Selection, Pressure Drop Ratio and Reject Rate
Induced and Dissolved Gas Flotation with Nitrogen or Fuel Gas Blanketing
Desanding Hydrocyclones, Sand Jetting and Oily Solids Handling
Day 3: Injection Water Quality Specifications and Seawater Preparation
Injection Water Specification Table: Oil-in-Water, TSS, Particle Size, Oxygen and SRB Counts
Nutshell Filter Backwash Cycle and Dual Media Filter Operation for Tertiary Polishing
Cartridge Filter Rating and Pore-Throat Bridging Rule for Formation Protection
Seawater Intake Screening, Coarse Filtration and Hypochlorite Dosing
Vacuum and Gas Stripping Deaeration Towers with Oxygen Scavenger Trim and Sulphate Removal Membranes at Overview
Day 4: Compatibility, Injectivity Decline and Disposal Well Performance
Commingling Produced Water with Seawater: Barium Sulphate and Calcium Carbonate Tendency Checks
Reservoir Souring Risk from Sulphate-Reducing Bacteria and Nitrate Treatment at Overview
Injectivity Index Trend and Hall Plot Diagnosis of Plugging versus Fracture Injection
Disposal Well Capacity: Target Zone Selection, Wellhead Pressure Limit and Well Integrity Checks
Reuse and Discharge Polishing Options: Membranes, Evaporation and Outfall Quality Limits
Day 5: Case Study: Produced Water Treatment and Reinjection Train Design
Case Field Data Pack: Water Forecast, Analyses and Existing Water Plant Constraints
Sampling Point Map and Measurement Methods: Solvent Extraction, Online Oil-in-Water Analysers and Millipore Tests
Treatment Train Selection Matrix with Stage Removal Efficiencies and Spare Capacity
Injection Pump, Header and Water Quality KPI Dashboard for Daily Surveillance
Produced Water Treatment and Reinjection Train Design Presentation and Peer Challenge
Skills You Will Gain:
Produced Water Characterisation
Water Management Route Screening
De-Oiling Stage Sizing
Injection Water Specification
Seawater Deaeration Control
Water Compatibility Assessment
Injectivity Decline Diagnosis
Oil-in-Water Measurement
Why Attend This Course:
Return with a Produced Water Treatment and Reinjection Train Design built on a case field data pack with stage efficiencies and quality targets
Keep injectors on line longer by linking rising injection pressure to the solids, oil or bacteria that caused it
Defend water plant upgrade and disposal decisions with a water balance, route comparison and measured removal performance
Compare water handling practice with production, facilities and reservoir peers from onshore and offshore oil fields
Conclusion:
Reliable water injection depends on knowing what is in the produced water, removing oil and solids stage by stage and holding every injected cubic metre to a clear specification. The course moves from produced water sources, volumes and management routes, through de-oiling and solids removal, to injection water specifications and seawater preparation, then to compatibility, souring, injectivity decline, disposal wells and reuse. The final day applies these methods to a case field and produces a treatment and reinjection train design ready for review.
Produced Water Treatment and Reinjection: De-Oiling, Injection Water Quality and Injectivity runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.