Onshore Pipeline Design and Construction: Route, Welding, Hydrotest and Commissioning – Dubai, 25 Jan – 5 Feb 2027
DestinationDubai
Dates25 January – 5 February 2027
Reference719_19152
This session
25 Jan – 5 Feb 2027
This Onshore Pipeline Design and Construction: Route, Welding, Hydrotest and Commissioning session in Dubai runs from Monday 25 January to Friday 5 February 2027 (week 4, Q1 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 35,100 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 25 Jan – Friday 5 Feb 2027
Week4 of 2027
Duration12 days
Fee35,100 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Onshore pipeline design and construction projects slip by months when the route, wall thickness and crossing details reach the spread unfinished, or when weld, lowering-in and hydrotest records are rejected at handover. This Core Concept course follows a new buried transmission line from its premise under ASME B31.4 and ASME B31.8, through corridor and location class, line pipe grade, hydraulics and pump or compressor facilities, to spread mobilisation, API 1104 welding, HDD crossings, hydrotesting, drying and first fill. Participants produce an Engineering Summary and Build-and-Hydrotest Programme for a worked corridor.
Course Objectives:
Write a premise document for a new buried line that fixes fluid, throughput, maximum operating conditions and the governing ASME B31.4 or ASME B31.8 code
Choose the corridor, location class, design factor, wall thickness and line pipe grade and record them in a calculation file
Size liquid and natural gas lines hydraulically and set pump or compressor facility spacing, surge protection and overpressure devices
Sequence a construction spread from right-of-way clearing and stringing through field bending, welding, joint coating, lowering-in and backfill
Witness spread work, API 1104 welds, radiography and ultrasonic results and HDD crossings against specifications, safety rules and environmental conditions
Programme hydrotesting, cleaning, gauging, drying, pre-commissioning and first fill and compile the handover dossier for a new line
Target Audience:
Pipeline engineers who fix wall thickness, hydraulic sizing and crossing details for new transmission lines
Project engineers who own scope, contractor interfaces, construction schedules and deliverable registers on pipeline projects
Construction engineers and spread supervisors who run right-of-way, mainline and tie-in crews
Field quality and construction surveillance staff who witness welding, coating, lowering-in, backfill and pressure testing
Welding and NDT coordinators who qualify procedures, test welders and accept mainline girth welds
Commissioning engineers who organise test sections, dewatering, drying and first fill of new lines
Course Outline:
Day 1: Onshore Pipeline Design Premise and Code Scope
Pipeline Project Life Cycle: Concept, FEED, Detailed Engineering, Construction and Handover
Premise Memorandum: Fluid, Throughput, Maximum Operating Pressure and Temperature
ASME B31.4 Liquid and Slurry Pipeline Scope and Requirements
ASME B31.8 Location Classes and Design Factors for Transmission Lines
Engineering Deliverables Register: Alignment Sheets, Datasheets and Calculation Files
Day 2: Corridor Routing, Location Class and Line Pipe Specification
Corridor Routing Study: Desktop Options, Terrain Scoring and Construction Access
Location Class Survey and Building Count Along the Corridor
Barlow Wall Thickness Calculation With Design Factor and Longitudinal Joint Factor
Line Pipe Grade, Seam Type and Fracture Toughness Specification for Buried Service
Depth of Cover, Mainline Valve Spacing and Burial Protection Such as Rockshield and Sand Padding
Day 3: Liquid and Natural Gas Line Hydraulic Sizing
Liquid Line Friction Loss, Hydraulic Gradient and Elevation Profile Plot
Natural Gas Flow Equations, Compressibility and Diameter Iterations
Diameter Versus Throughput Trade-Off Using Steel Tonnage and Energy Cost
Surge Screening, Relief Paths and Overpressure Protection Philosophy
Regulating and Metering Skid Arrangements at Delivery Points
Day 4: Pump and Compressor Facilities, Crossings, CP and Coating Choice
Pump and Compressor Facility Plot Layout and Spacing Along the Route
Road, Rail and Wadi Crossing Details: Casing, Open Cut and Auger Boring
Foreign Pipeline and Utility Crossing Separation and Protection Details
Cathodic Protection Concept: Impressed Current and Galvanic Anode Options
Mainline Coating Choice: Three-Layer Polyolefin and Fusion-Bonded Epoxy Systems
Day 5: Week-One Guided Exercise: Worked Corridor Engineering Package
Worked Corridor Data Pack: Throughput, Terrain Profile and Crossing Inventory
Team Routing and Location Class Proposal With Alignment Sheet Markup
Wall Thickness and Grade Worksheet for the Worked Corridor
Hydraulic Profile and Pump or Compressor Count Check
Engineering Review Panel: Crossing Details, Coating and CP Concept Defence
Day 6: Construction Spread Mobilisation and Mainline Sequence
Spread Organisation, Crew Sequence and Daily Footage Targets
Right-of-Way Staking, Clearing, Grading and Trenching Methods
Pipe Handling, Stringing and Cold Field Bending Limits
Field Joint Coating Application, Holiday Detection and Repair
Lowering-In, Padding, Backfill and Right-of-Way Reinstatement
Day 7: Construction Surveillance Duties, Safety and Environmental Care
API 1169 Knowledge Areas: General Construction Inspection and Inspector Responsibilities
Inspection and Test Plan Hold Points and Daily Field Report Writing
Spread Safety: Excavation, Lifting, Sidebooms and Trench Entry Hazards
Environmental and Pollution Prevention: Topsoil Stripping, Spill Kits and Waste Handling
Nonconformance Reports, Punch Lists and Construction Quality Records
Day 8: API 1104 Girth Welding, NDT and HDD Crossing Execution
API 1104 Welding Procedure Specification and Procedure Qualification Testing
Welder Qualification Tests and Mainline Welding Parameter Monitoring
Radiography and Automated Ultrasonic Testing With Girth Weld Acceptance Criteria
Tie-In Welds, Weld Repairs and Golden Weld Treatment
HDD Crossing Execution: Pilot Hole, Reaming, Pullback and Drilling Fluid Management
Day 9: Hydrotesting, Dewatering, Drying and First Fill
Hydrotest Section Breakdown, Test Pressure and Hold Period Setting
Test Water Sourcing, Filling, Pressure-Temperature Charts and Acceptance
Cleaning Runs, Gauging Plate Runs and Caliper Pig Verification of New Pipe
Dewatering and Drying Methods: Dry Air, Vacuum Drying and Dew Point Checks
Pre-Commissioning Checklists, Nitrogen Purging, First Fill and Handover Dossier
Day 10: Capstone: Engineering Summary and Build-and-Hydrotest Programme
Capstone Brief: Worked Corridor Scope, Constraints and Contract Interfaces
Engineering Summary Drafting: Code, Corridor, Wall Thickness, Hydraulics and Crossings
Construction Sequence and Spread Resource Schedule for the Worked Corridor
Welding, Surveillance, Hydrotest and Commissioning Programme With Record Formats
Programme Presentation and Peer Technical Challenge Session
Skills You Will Gain:
Pipeline Premise Definition
Location Class Assessment
Line Pipe Wall Thickness Calculation
Hydraulic Line Sizing
Construction Spread Sequencing
Girth Weld Acceptance
Hydrotest and Drying Programming
Handover Dossier Compilation
Why Attend This Course:
Leave with an Engineering Summary and Build-and-Hydrotest Programme for a worked corridor that mirrors your own project
Trace how a choice of route, wall thickness or crossing method changes spread cost, welding workload and hydrotest sections
Practise the field checks made on welding, coating, lowering-in and backfill before a trench is closed
Compare construction practice with engineers from crude, natural gas, water and refined product line projects
Conclusion:
A new onshore line reaches service on time when its premise, corridor, pipe specification, hydraulics and crossings are settled before the spread mobilises, and when weld, coating, lowering-in and hydrotest records are complete at handover. Week one builds the engineering package under ASME B31.4 and ASME B31.8 and ends with a guided review. Week two moves to the right-of-way: spread sequencing, field surveillance, API 1104 girth welding, HDD crossings, hydrotesting, drying and first fill, finishing with an Engineering Summary and Build-and-Hydrotest Programme.
Onshore Pipeline Design and Construction: Route, Welding, Hydrotest and Commissioning runs in Dubai over 12 days, with 2 upcoming dates in Dubai. The course fee is 35,100 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.