Trenchless Rehabilitation of Water and Sewer Pipes: CIPP Lining, Pipe Bursting and Renewal Planning – Paris, 27 Sep – 1 Oct 2027
DestinationParis
Dates27 September – 1 October 2027
Reference764_19650
This session
27 Sep – 1 Oct 2027
This Trenchless Rehabilitation of Water and Sewer Pipes: CIPP Lining, Pipe Bursting and Renewal Planning session in Paris runs from Monday 27 September to Friday 1 October 2027 (week 39, Q3 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 27 Sep – Friday 1 Oct 2027
Week39 of 2027
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Trenchless rehabilitation lets utilities renew cracked, leaking and root-infested water mains and sewers without digging up busy streets, yet many schemes fail because the liner was chosen before the host pipe was surveyed, the design ignored groundwater or ovality, or nobody tested the cured sample. This Core Concept course trains network engineers, planners and contractor supervisors to grade buried pipe condition from CCTV and leak surveys, rank renewal, select between CIPP lining, sliplining, pipe bursting, spray linings and spot repairs, check liner design and control installation. Participants produce a Trenchless Rehabilitation Programme for a case network section.
Course Objectives:
Grade the structural and service condition of buried sewers and water mains from CCTV footage, defect codes, leak surveys and manhole inspection records
Rank pipe renewal candidates by likelihood and consequence of failure and convert the ranking into a phased rehabilitation budget
Select CIPP lining, sliplining, pipe bursting, spray lining, spot repair or directional drilling for a pipe run by size, host material, host condition, groundwater and traffic
Check CIPP liner wall thickness and specification clauses for partially and fully deteriorated host pipes and set resin, cure and sample test requirements
Supervise liner installation, lateral reinstatement and manhole renewal with hold points, bypass pumping plans, post-lining CCTV and acceptance tests
Prepare a Trenchless Rehabilitation Programme with method choice, cost comparison against open-cut, contract packaging and traffic staging for a network section
Target Audience:
Sewer and water network engineers who decide which buried pipes to reline, replace or leave in service
Asset planners who build multi-year renewal lists and capital budgets for underground pipe networks
Rehabilitation contractor engineers who price, plan and deliver lining, bursting and sliplining works
Site supervisors and inspectors who witness liner wet-out, curing, reinstatement and final CCTV acceptance
Consultant engineers who write trenchless specifications and review liner design submittals for utilities
Course Outline:
Day 1: Buried Pipe Deterioration and Condition Survey Techniques
Deterioration Mechanisms in Clay, Concrete, Asbestos Cement, Cast Iron and Plastic Pipes
Hydrogen Sulphide Corrosion, Root Intrusion, Infiltration and Exfiltration in Gravity Sewers
CCTV Crawler Survey Procedure and Defect Coding With Structural and Service Grades
Acoustic Leak Survey, Sonar Profiling and Laser Ovality Scans for Pressure Mains
Manhole Inspection Sheets, Flow Monitoring and Sewer Record Gaps
Day 2: Renewal Prioritisation and Trenchless Method Families
Likelihood and Consequence of Failure Scoring for Pipe Criticality Ranking
Renewal Candidate Register From Burst History, Blockage Logs and Survey Grades
Rehabilitation Method Families: Lining, Replacement, Spot Repair and New Installation
Cured-in-Place Pipe: Felt and Glass-Fibre Tubes, Inversion, Pull-In and Hot Water, Steam or UV Curing
Sliplining, Fold-and-Form Pipe, Spiral Wound Lining and Pipe Bursting With Upsizing Principles
Day 3: Method Selection and Liner Design Checks
Method Selection Matrix by Pipe Size, Host Material, Host Condition, Groundwater and Street Traffic
Partially Versus Fully Deteriorated Host Pipe Design Conditions for CIPP Wall Thickness
ASTM F1216 and EN ISO 11296-4 Flexural Property Requirements for Liner Samples
Sliplining Annulus Grouting and Flow Capacity Check After Cross-Section Loss
Spray-Applied Cementitious and Epoxy Linings and Mechanical Spot Repair Packers for Water Mains
Day 4: Installation Control, Laterals, Manholes and Failure Cases
Bypass Pumping, Pipe Cleaning, Root Cutting and Pre-Lining CCTV Hold Points
Resin Wet-Out Records, Cure Temperature Logs and Cured Sample Testing at a Third-Party Laboratory
Lateral Reinstatement Cutting, Lateral Connection Seals and Manhole Chamber Relining
Pipe Bursting Risks: Adjacent Utilities, Ground Heave and Launch and Receiving Pit Design
Day 5: Case Study: Trenchless Rehabilitation Programme
Case Network Section File: CCTV Grades, Leak Records, Traffic Constraints and Service Connections
Pipe-by-Pipe Method Choice With Liner Design Summary and Test Plan
Unit Rate Build-Up and Whole-Life Cost Comparison Against Open-Cut Replacement
Contract Packaging, Measurement Items, Warranty Inspection and Payment Milestones
Trenchless Rehabilitation Programme Presentation and Panel Challenge
Skills You Will Gain:
Sewer CCTV Defect Grading
Pipe Criticality Ranking
Trenchless Method Selection
CIPP Liner Design Checking
Lining Installation Supervision
Lateral and Manhole Renewal
Rehabilitation Cost Estimating
Renewal Programme Planning
Why Attend This Course:
Leave with a Trenchless Rehabilitation Programme for a case network section, defended before a review panel
Avoid relining pipes that should be burst or replaced by reading host condition correctly before choosing a method
Reject a defective liner at handover using cure logs, sample results and post-lining CCTV rather than visual impressions
Compare relining and bursting practice with engineers from water utilities, municipal drainage departments, industrial estates and contractors
Conclusion:
Underground pipes are renewed well only when survey data, method choice, liner design and site control are linked in one programme. The one week move from deterioration mechanisms and CCTV, leak and sonar surveys, through criticality ranking and the trenchless method families, to method selection, liner wall thickness and sample test requirements, and then installation control, laterals, manholes and failure cases. The final day produces a Trenchless Rehabilitation Programme with method choices, costs and contract packaging for a case network section.
Trenchless Rehabilitation of Water and Sewer Pipes: CIPP Lining, Pipe Bursting and Renewal Planning runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.