Primavera P6 and MS Project: Hands-On Schedule Building, Resourcing and Updating – Paris, 22–26 Feb 2027
DestinationParis
Dates22 – 26 February 2027
Reference776_19783
This session
22–26 Feb 2027
This Primavera P6 and MS Project: Hands-On Schedule Building, Resourcing and Updating session in Paris runs from Monday 22 February to Friday 26 February 2027 (week 8, Q1 2027). It is the 1st of 2 dates in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 22 Feb – Friday 26 Feb 2027
Week8 of 2027
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Schedules built in Primavera P6 and MS Project (Microsoft Project) often fail at the keyboard rather than in theory: calendars are wrong, summary tasks carry links, constraints mask the critical path, resources are never loaded and progress is entered without a data date or status date. Owners and contractors then exchange files that neither side trusts. This Core Concept course trains planners to set up, load, baseline and update schedules in both tools and move them cleanly between the two. Participants produce a Dual-Tool Case Schedule Pack: one case project built, baselined and statused in both applications.
Course Objectives:
Set up enterprise project structure, projects, calendars and scheduling options in Primavera P6 and Microsoft Project
Build activities, WBS nodes, summary tasks, relationships, lags and constraints so each tool calculates a valid critical path and float
Load labour, nonlabour, material and cost resources, then level overallocations using the levelling functions of each tool
Save baselines and record progress against a data date or status date, handling out-of-sequence work and earned value fields
Configure layouts, views, filters, groupings and reports, and run in-tool schedule quality checks
Transfer schedules between the two applications through XER and XML files and verify the imported data
Target Audience:
Planning staff who build and maintain project schedules for owners, contractors or consultants
Scheduling staff who record periodic progress and issue schedule updates
Project controls staff who review contractor schedule submissions and resource curves
Project and site engineers who sequence work packages and estimate activity durations
PMO support staff who consolidate schedule files and produce Gantt and status reports
Course Outline:
Day 1: Workspace Set-Up, Project Creation and Calendars
Primavera P6 Professional Workspace: Enterprise Project Structure, OBS and Projects Window
Microsoft Project Interface: Ribbon, Gantt Chart View, Entry Table and Timeline Bar
Project Creation Settings: Planned Start, Auto-Scheduled Versus Manually Scheduled Tasks
Global, Project and Resource Calendars: Work Weeks, Holidays and Exceptions in Both Tools
Day 2: WBS, Activity Types, Task Types and Network Logic Entry
WBS Nodes in P6 Versus Outline Levels and Summary Tasks in Microsoft Project
P6 Activity Types: Task Dependent, Resource Dependent, Level of Effort and Milestones
Microsoft Project Task Types: Fixed Units, Fixed Duration, Fixed Work and Effort-Driven Setting
Relationship Entry: FS, SS, FF and SF Links With Lags in the Relationships Tab and Task Information Dialog
Constraints, Deadlines and Recalculation: the P6 Schedule Command and Microsoft Project Automatic Calculation
Day 3: Critical Path Display, Resource and Cost Loading, Levelling and Baselines
Longest Path and Total Float Display in P6 and Task Path Highlighting in Microsoft Project
Resource Dictionary and Resource Sheet: Labour, Nonlabour, Material and Cost Resources With Rates
Resource Assignments, Budgeted Units, Resource Usage Profiles and Levelling Priorities
Baseline Assignment in P6 and Save Baseline Fields in Microsoft Project
P6 Layouts and Microsoft Project Custom Views: Filters, Groupings, Columns and Printed Reports
Day 4: Progress Updating, Earned Value Fields, Quality Filters and File Exchange
Progress Entry Against the P6 Data Date and Microsoft Project Status Date: Actual Dates and Remaining Durations
Retained Logic, Progress Override and Out-of-Sequence Progress Handling
Percent Complete Types and Earned Value Columns in P6 Compared With Microsoft Project Tracking Fields
In-Tool Quality Filters: Open Ends, Hard Constraints, Negative Float, Long Lags and Missing Resources
XER and XML Schedule Exchange Between P6 and Microsoft Project With Field Mapping Checks
Day 5: Lab Capstone: Dual-Tool Case Schedule Pack
Case Project Data Set: Engineering and Technology Scope, Milestones, Resources and Rates
Case Schedule Build in Primavera P6: Structure, Logic, Resource Loading and Baseline
Parallel Build in Microsoft Project and Reconciliation After XML Transfer
Two Update Cycles: Progress Entry, Baseline Variance Columns and Recovery Options
Dual-Tool Case Schedule Pack Presentation and Peer File Review
Skills You Will Gain:
P6 Enterprise Structure Configuration
Calendar and Scheduling Option Set-Up
Network Logic Entry
Resource and Cost Loading
Resource Levelling in Software
Baseline and Progress Management
Schedule Layout and Report Design
Schedule File Exchange
Why Attend This Course:
Leave with a Dual-Tool Case Schedule Pack: one case project built, baselined and updated in both Primavera P6 and Microsoft Project
Work confidently in whichever tool an owner, contractor or consultant specifies, and read files produced in the other
Find the calendar, constraint and summary-link errors that make software-calculated dates unreliable
Compare scheduling practice with planners from construction, energy, technology and public infrastructure projects
Conclusion:
A schedule is only as reliable as the way it is configured and maintained in the software. The course moves from workspace set-up, calendars and project creation, through WBS, activity and task types and logic entry, to critical path display, resource and cost loading, levelling, baselines and layouts, then to progress updating, earned value fields, quality filters and file exchange. The final day produces a Dual-Tool Case Schedule Pack that participants can use as a working template for their next Primavera P6 or Microsoft Project schedule.
Primavera P6 and MS Project: Hands-On Schedule Building, Resourcing and Updating runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.