Lean Manufacturing: Takt, Cells, SMED and Heijunka on the Shop Floor – Dubai, 4–8 Jan 2027
DestinationDubai
Dates4 – 8 January 2027
Reference867_20780
This session
4–8 Jan 2027
This Lean Manufacturing: Takt, Cells, SMED and Heijunka on the Shop Floor session in Dubai runs from Monday 4 January to Friday 8 January 2027 (week 1, Q1 2027). It is the only date in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
DatesMonday 4 Jan – Friday 8 Jan 2027
Week1 of 2027
Duration5 days
Fee19,500 SAR
StatusOpen for registration
FormatIn person
VenueFive-star CBD venue
Programme overview
Introduction:
Many plants run lines that are out of step with demand: stations wait while others overload, changeovers stretch across shifts, work in progress piles up between machines and defects travel downstream before anyone stops the line. This Core Concept course applies lean manufacturing on the factory floor, setting takt from customer demand, balancing operators to it, building cells and pull loops, cutting changeovers with SMED and levelling the product mix with heijunka. Participants model a case production line and produce a Lean Line Redesign Pack with takt, standard work and a changeover plan.
Course Objectives:
Calculate takt time and pitch from available shift time and customer demand and compare them with measured cycle times
Rebalance operator work to takt using Yamazumi and operator balance charts and design U-shaped cells
Set up supermarket pull, FIFO lanes and production kanban quantities between decoupled processes
Reduce changeover time by separating, converting and streamlining setup elements with SMED
Build line-stop and mistake-proofing controls with jidoka and poka-yoke methods
Level volume and mix at the pacemaker process with a heijunka box and track lead time, WIP and first-pass yield
Target Audience:
Managers responsible for the output, staffing and daily performance of production lines
Supervisors responsible for shifts, cells and operator work allocation
Industrial engineering staff responsible for line layout, cycle times and work content
Process engineering staff responsible for machine setups, changeovers and process stability
Continuous improvement staff responsible for flow and pull projects in the plant
Course Outline:
Day 1: Demand, Takt and the Production Line Baseline
Takt Time Calculation from Available Shift Time and Customer Demand
Pitch Interval and Pack-Out Quantity for Finished Goods
Product-Quantity Analysis and Product Family Matrix for Line Selection
Muda, Mura and Muri Observation Checklist on a Running Line
Line Baseline Study: Stopwatch Cycle Times, WIP Count and First-Pass Yield
Day 2: Continuous Flow, Cells and Pull Models
One-Piece Flow Versus Batch-and-Queue Lead Time Comparison
U-Shaped Cell Design and Lean Layout Rules for Machines and Operators
Line Balancing with Yamazumi and Operator Balance Charts
Supermarket Pull and FIFO Lanes Between Decoupled Processes
Production Kanban Quantity Formula for Cell Replenishment
Day 3: Standard Work, SMED and Jidoka at the Machine
Standard Work Elements: Takt, Work Sequence and Standard WIP
Process Capacity Sheet and Standardised Work Chart for a Cell
SMED Stages: Separate, Convert and Streamline Internal Setup
Changeover Video Analysis and Setup Element Sheet
Jidoka Line-Stop Logic with Contact, Fixed-Value and Motion-Step Poka-Yoke
Day 4: Levelling, Visual Control and Sustaining Lean in the Plant
Heijunka Box Levelling by Volume and Product Mix at the Pacemaker
Every Part Every Interval Calculation and Changeover-Driven Lot Sizing
Hour-by-Hour Production Board and Tiered Daily Meeting Escalation
Gemba Walk Routine and Leader Standard Work for Production Managers
Manufacturing KPI Set: Lead Time, WIP Days and First-Pass Yield Tracking
Day 5: Case Line Redesign and the Lean Line Redesign Pack
Case Production Line Brief: Mixed Models, Long Changeovers and High WIP
Takt and Yamazumi Rebalancing Model for the Case Line
Future Cell Layout and Standard Work Package Build
SMED Plan and Heijunka Sequence for the Case Line
Lean Line Redesign Pack Presentation and Peer Challenge
Skills You Will Gain:
Takt and Pitch Setting
Operator Line Balancing
Cell Layout Design
Pull Loop Sizing
Changeover Reduction
Mistake-Proofing Design
Mix Levelling
Shop-Floor Performance Tracking
Why Attend This Course:
Leave with a Lean Line Redesign Pack for a case line, tested by peers and ready to adapt to your own line
Replace uneven station loading and long queues with work balanced to a takt that operators can see
Cut changeover time step by step so smaller batches and a levelled mix become practical
Compare line layouts and changeover practice with production staff from food, packaging, automotive parts and electronics plants
Conclusion:
A lean production line runs to the rhythm of demand, keeps work flowing between cells, changes over quickly and stops itself when something goes wrong. The week moves from takt, pitch and a measured line baseline, through continuous flow, cells and pull loops, to standard work, SMED and jidoka, and then to heijunka levelling, shop-floor visual control and the KPIs that keep gains in place. The final day builds a Lean Line Redesign Pack for a case production line.
Lean Manufacturing: Takt, Cells, SMED and Heijunka on the Shop Floor runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.
Looking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, project management and digital transformation — open enrolment and in-house programmes for the Gulf region.