Project Planning and Scheduling: Critical Path Method (CPM) and Schedule Analysis – Paris, 28 Jun – 2 Jul 2027
DestinationParis
Dates28 June – 2 July 2027
Reference1062_4804
This session
28 Jun – 2 Jul 2027
This Project Planning and Scheduling: Critical Path Method (CPM) and Schedule Analysis session in Paris runs from Monday 28 June to Friday 2 July 2027 (week 26, Q2 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
Many projects miss their dates not because the work is hard but because the schedule was never a working model: activities lack logic, float is misread, resources are overloaded and the critical path shifts unnoticed. Sponsors then receive completion dates that cannot be defended. This Core Concept course builds the planning and scheduling competence to create logic-driven, resource-loaded schedules, identify the true critical path and test the dates they produce. Participants work through cases from several sectors and leave with a Baseline Schedule Model for a project of their own.
Course Objectives
Structure project scope into a work breakdown structure and WBS dictionary that support scheduling and control
Build a logic-linked network schedule with the Precedence Diagramming Method and calculate the critical path, total float and free float
Estimate activity durations with three-point and productivity-based methods, load resources and level them to remove overallocation
Assess schedule quality against a recognised health check and critical path practice, correcting logic, constraint and float defects
Compress, update and re-baseline a schedule, and state completion dates at a defined confidence level using Monte Carlo simulation
Produce a Baseline Schedule Model with a schedule basis document ready for sponsor or client approval
Target Audience
Project planners and schedulers who build and maintain schedule models
Project managers responsible for delivery dates and schedule baselines
Project controls staff who record progress and report schedule variance
Engineers and technical leads who estimate durations and sequence work packages
PMO managers and analysts who review and consolidate schedules across multiple projects
Contract and commercial managers who assess time impacts and extension of time requests
Course Outline
Day 1: Planning Foundations and Scope Structure
Project Life Cycle and Planning Approach Under ISO 21502
Schedule Performance Domain in the PMBOK Guide Eighth Edition
Work Breakdown Structure Development to ISO 21511
WBS Dictionary and Control Account Definition
Schedule Maturity Review Using the PMI Practice Standard for Scheduling Conformance Assessment
Day 2: Network Scheduling Methods and Standards
Precedence Diagramming Method: FS, SS, FF and SF Relationships
Critical Path Method Forward and Backward Pass Calculation
Total Float and Free Float Interpretation
PERT Three-Point Estimating and the Beta Distribution
Critical Chain Method and Buffer Management
Day 3: Building and Resourcing the Schedule
Activity Definition and Duration Estimating from Productivity Rates
Leads, Lags and Constraints in Primavera P6 and Microsoft Project
Resource Loading and Histogram Analysis
Resource Levelling and Resource Smoothing Techniques
Milestone Schedule and Gantt Chart Reporting Formats
Day 4: Schedule Quality, Control and Risk
Critical Path Identification to AACE Recommended Practice 49R-06
14-Point Schedule Quality Health Check
Schedule Compression: Crashing and Fast-Tracking Cost-Time Trade-Off
Baseline Updating, Progress Measurement and Schedule Variance Analysis
Schedule Risk Analysis with Monte Carlo Simulation and P50 and P80 Dates
Day 5: Modelling Build and the Baseline Schedule Model
Infrastructure Project Case: Network Build and Critical Path Calculation
Digital Transformation Case: Resource-Constrained Rescheduling
Baseline Schedule Model Build for an Own Project
Schedule Basis Document and Float Analysis Drafting
Peer Schedule Review and Model Defence
Skills You Will Gain
Work Breakdown Structuring
Network Logic Development
Critical Path Calculation
Duration Estimating
Resource Levelling
Schedule Quality Assurance
Schedule Compression Analysis
Probabilistic Schedule Forecasting
Why Attend This Course
Return to work with a Baseline Schedule Model for a live project, its critical path and float already tested by peers
Spot the missing logic, hard constraints and negative float that make a schedule's dates unreliable
Give sponsors a completion date with a stated confidence level instead of a single optimistic date
Compare planning practice with professionals scheduling construction, technology and public service projects in other countries
Conclusion
A schedule earns trust only when its logic is complete, its durations are grounded in evidence and its critical path can be explained. This course moves from scope structure and network methods, through resource loading and levelling, to the quality checks, compression options and risk analysis that keep dates realistic. The final day turns that material into a Baseline Schedule Model that participants take back to their project, giving them a defensible basis for every date they commit to and every variance they report.
Project Planning and Scheduling: Critical Path Method (CPM) and Schedule Analysis runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.