Earned Value Management (EVM) and Project Cost Control – Dubai, 11–15 Jan 2027
DestinationDubai
Dates11 – 15 January 2027
Reference1064_4827
This session
11–15 Jan 2027
This Earned Value Management (EVM) and Project Cost Control session in Dubai runs from Monday 11 January to Friday 15 January 2027 (week 2, Q1 2027). It is the 1st of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
Project budgets are often reported as money spent against money planned, which says nothing about the work actually achieved. Overruns then surface late, when recovery options are few and expensive. This Core Concept course builds the cost control and earned value competence to integrate scope, schedule and cost into one performance baseline, measure progress objectively and forecast the final cost while there is still time to act. Participants work with datasets from several sectors and leave with an Earned Value Performance Model and cost control report for a project of their own.
Course Objectives
Classify and prepare project cost estimates and a cost breakdown structure fit for control
Establish a time-phased performance measurement baseline with control accounts in line with ISO 21508
Measure progress objectively and calculate cost and schedule variances, performance indices and estimates at completion
Control baseline changes, reserves and contingency drawdown, and detect distortions in earned value data
Forecast completion dates with the earned schedule method and report integrated cost and schedule performance
Produce an Earned Value Performance Model and monthly cost control report for sponsor review
Target Audience
Project managers accountable for budget and cost forecast performance
Project controls managers operating integrated cost and schedule reporting
Cost managers responsible for budgets, commitments and cost forecasts on capital projects
PMO managers setting performance measurement standards across projects
Finance business partners supporting project budgeting and capital expenditure reporting
Contract managers assessing supplier progress claims against achieved work
Course Outline
Day 1: Cost Management Foundations and Estimating
Project Cost Management in the PMBOK Guide Eighth Edition Finance Performance Domain
Cost Estimate Classification to AACE Recommended Practice 18R-97
Bottom-Up, Parametric and Analogous Cost Estimating
Cost Breakdown Structure Linked to an ISO 21511 Work Breakdown Structure
Cost Control Maturity Review Against the AACE Total Cost Management Framework
Day 2: Earned Value Standards and the Performance Baseline
ISO 21508:2026 Earned Value Management Guidance
ISO 21512:2024 Earned Value Management Implementation Guidance
PMI Standard for Earned Value Management Key Concepts
Control Account Plans and Work Package Planning
Performance Measurement Baseline and Time-Phased Budget S-Curve
Day 3: Measuring Performance and Forecasting Cost
Earned Value Techniques: Percent Complete, Weighted Milestones and the 50/50 Rule
Planned Value, Earned Value and Actual Cost Data Collection
Cost Variance, Schedule Variance, CPI and SPI Calculation
Estimate at Completion Methods and the To-Complete Performance Index
Variance Analysis Report and Corrective Action Log
Day 4: Advanced Control, Reserves and Data Pitfalls
Earned Schedule Method for Late-Stage Completion Forecasting
Baseline Change Control and Management Reserve Governance
Contingency Drawdown Tracking and Cost Risk Exposure
Front-Loading, Level-of-Effort Distortion and Other EVM Data Pitfalls
Integrated Cost and Schedule Dashboards in Primavera P6 and Power BI
Day 5: Modelling Build and the Earned Value Performance Model
Engineering Project Case: EVM Dataset Build and Performance Diagnosis
Information Technology Project Case: EAC Challenge and Recovery Options
Earned Value Performance Model Build for an Own Project
Monthly Cost Control Report Drafting
Peer Model Review and Forecast Defence
Skills You Will Gain
Cost Estimating
Performance Baseline Development
Earned Value Analysis
Cost Forecasting
Variance Analysis
Baseline Change Control
Reserve Management
Project Performance Reporting
Why Attend This Course
Return to work with an Earned Value Performance Model for a live project, its forecast already tested by peers
Read CPI, SPI and TCPI figures with confidence and explain to sponsors what they mean for the final cost
Recognise when earned value data is being flattered by front-loaded budgets or level-of-effort work
Compare cost control practice with managers from engineering, technology and public infrastructure projects
Conclusion
Cost control works only when spending is compared with the work actually achieved, not with the calendar. This course moves from estimate classification and cost structures, through the earned value standards and performance baseline, to the measurement, forecasting, reserve control and data checks that make the numbers reliable. The final day turns that material into an Earned Value Performance Model that participants take back to their project, giving them an objective early warning of overruns and a forecast they can defend to sponsors.
Earned Value Management (EVM) and Project Cost Control runs in Dubai over 5 days, with 2 upcoming dates in Dubai. The course fee is 19,500 SAR.