Construction Claims and Extension of Time: Notices, Delay Analysis and Quantum – London, 10–14 May 2027
DestinationLondon
Dates10 – 14 May 2027
Reference1191_6606
This session
10–14 May 2027
This Construction Claims and Extension of Time: Notices, Delay Analysis and Quantum session in London runs from Monday 10 May to Friday 14 May 2027 (week 19, Q2 2027). It is the 1st of 2 dates in London in 2027, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 10 May – Friday 14 May 2027
Week19 of 2027
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Technical depth: Practitioner · Practical mode: Case study
Introduction
Contractors lose valid entitlement to time and money because notices are late, records are thin and delay is asserted rather than demonstrated. Employers and consultants, in turn, reject or accept claims without a consistent method, which pushes disputes towards adjudication and arbitration. This Core Concept course equips both sides to handle claims to a recognised standard: meeting notice requirements, proving critical delay with accepted analysis methods and valuing time-related cost. Participants work on case files from several sectors and leave with a Claim Submission Package, or its assessment equivalent, for a delay event.
Course Objectives
Identify contractual entitlement to time and money and the notice and time-bar requirements that protect it
Issue and track notices of claim and supporting particulars within contractual time limits
Demonstrate critical delay using an appropriate schedule analysis method and contemporaneous records
Calculate extension of time, prolongation cost and disruption using accepted valuation methods
Assess an opponent's claim for gaps in causation, records and quantum, and draft a reasoned response
Assemble a Claim Submission Package that can be carried forward to determination or dispute resolution
Target Audience
Contract and commercial managers who prepare or defend claims
Planning and scheduling managers responsible for delay analysis and programme updates
Quantity surveyors and cost managers who value variations, prolongation and disruption
Engineers and consultants who assess contractor claims and advise on determinations
Project managers accountable for notices and records on site
Course Outline
Day 1: Claims Landscape and Entitlement
Claim Types: Variations, Delay, Disruption and Acceleration
Sources of Entitlement: Express Terms, Implied Terms and Breach
Notice Requirements and Time Bars Under FIDIC Sub-Clause 20.2
Prevention Principle and Time at Large Concepts
Contract Records Health Check Using a Records Adequacy Checklist
Day 2: Delay Analysis Standards and Methods
SCL Delay and Disruption Protocol Core Principles
AACE 29R-03 Forensic Schedule Analysis Taxonomy
Time Impact Analysis Under AACE 52R-06
Windows and As-Planned Versus As-Built Analysis Methods
Concurrent Delay, Float Ownership and Critical Path Tests
Day 3: Preparing the Claim
Notice of Claim Drafting and Notice Register Maintenance
Contemporaneous Records Index: Diaries, Correspondence and Programme Updates
Fragnet Build and Extension of Time Calculation
Prolongation Cost Build-Up: Site Overheads and Time-Related Resources
Fully Detailed Claim Narrative Structure: Cause, Effect and Entitlement
Day 4: Quantum, Disruption and Assessment
Head Office Overhead Recovery Using Hudson, Emden and Eichleay Formulae
Disruption Quantification Using Measured Mile and Earned Value Under ISO 21508
Global Claims and Total Cost Method Risks
Engineer's Assessment and Response Under FIDIC Sub-Clause 3.7
Compensation Events Under NEC4 and FIDIC 1999 Comparison
Day 5: Case Work and the Claim Submission Package
Power Plant Case Study: Late Access and Extension of Time Entitlement
Building Project Case Study: Disruption Claim and Records Gaps
Claim Submission Package Build for a Delay Event
Opposing-Party Assessment Exercise and Rebuttal Drafting
Claim Review Panel and Package Defence
Skills You Will Gain
Contractual Entitlement Analysis
Notice Management
Forensic Delay Analysis
Critical Path Analysis
Quantum Valuation
Disruption Analysis
Claim Rebuttal
Claim Narrative Writing
Why Attend This Course
Return to work with a Claim Submission Package, or a reasoned assessment, for a real or realistic delay event
Protect entitlement by putting notices, records and time-bar tracking in place before events occur
Choose and defend a delay analysis method that matches the records and programme available
Test your approach against contractors, employers and consultants from other sectors
Conclusion
A construction claim succeeds or fails on notice, records and a credible link between cause and effect. This course moves from establishing entitlement and time bars, through the recognised delay analysis standards and methods, to preparing the claim, valuing prolongation and disruption, and assessing claims from the other side of the table. The final day brings these elements together in a Claim Submission Package, giving participants a disciplined approach to the next delay event on their project.
Construction Claims and Extension of Time: Notices, Delay Analysis and Quantum runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.
Looking for training courses in London? CoreConsept Training Center delivers professional training in London across governance, leadership, ESG, project management and digital transformation — open enrolment programmes in central London venues.