Maintenance Planning and Scheduling with CMMS: Work Orders, Backlog and KPIs – London, 1–5 Mar 2027
DestinationLondon
Dates1 – 5 March 2027
Reference82_9196
This session
1–5 Mar 2027
This Maintenance Planning and Scheduling with CMMS: Work Orders, Backlog and KPIs session in London runs from Monday 1 March to Friday 5 March 2027 (week 9, Q1 2027). It is the 1st of 2 dates in London in 2027, at a fee of 23,000 SAR, the same for each of them. Registration is open for this date. It is held in person at Central London four-star.
DatesMonday 1 Mar – Friday 5 Mar 2027
Week9 of 2027
Duration5 days
Fee23,000 SAR
StatusOpen for registration
FormatIn person
VenueCentral London four-star
Programme overview
Introduction:
Maintenance planning and scheduling breaks down when work orders arrive with vague descriptions, job plans live in planners' heads, backlog grows unmeasured and the CMMS holds duplicate equipment records and missing spare parts links. Crews then wait for parts, permits and access instead of working. This Core Concept course equips planners, schedulers and supervisors to run the work order cycle in a CMMS from request to close-out, build job packages, control backlog and issue a weekly schedule operations will release equipment for. Participants leave with a Work Management Improvement Plan and a sample weekly schedule.
Course Objectives:
Run the maintenance work order cycle in a CMMS from work request and approval through planning, scheduling, execution and technical close-out
Build job plans and task lists with labour, material, tool, permit and duration estimates that crews can execute without delay
Measure and control maintenance backlog in crew-weeks and prioritise work using a documented criticality and priority matrix
Prepare a weekly maintenance schedule and daily crew assignments, and agree equipment release with operations in a coordination meeting
Set up preventive maintenance plans, equipment hierarchy, failure codes and spare parts links in the CMMS so that work history is usable for decisions
Report schedule compliance, PM compliance, planned work percentage and wrench time, and act on the results
Target Audience:
Planning staff who prepare job plans, material requests and work packages for maintenance crews
Scheduling staff who build weekly and daily maintenance schedules and coordinate equipment release
First-line maintenance supervisors who assign work, check completion and close work orders
CMMS administrators and key users responsible for equipment records, PM plans and system configuration
Maintenance stores and materials coordinators who link spare parts to equipment and reserve materials for jobs
Operations coordinators who raise work requests and agree maintenance windows with maintenance teams
Course Outline:
Day 1: The Maintenance Work Management Process and Current-State Review
Work Management Cycle Map: Request, Approval, Planning, Scheduling, Execution and Close-Out
Planning Versus Scheduling: Separate Roles, Planner-to-Craft Ratios and Planner Time Theft
Work Order Types and Status Codes in a CMMS
Proactive Versus Reactive Work Balance and the Cost of Break-In Work
Work Management Maturity Self-Assessment Against a Process Checklist
Day 2: CMMS Data Structures, Hierarchy and Reference Models
Equipment Hierarchy Design Using the ISO 14224 Taxonomy Levels
Functional Location and Equipment Record Conventions with Naming and Numbering Rules
Failure, Cause and Remedy Code Libraries Aligned with ISO 14224
Bill of Materials and Spare Parts Linkage to Equipment Records
SMRP Best Practice Metrics and EN 15341:2019+A1:2022 Indicator Definitions for Work Management
Day 3: Planning Job Packages and Building the Weekly Schedule
Work Request Screening and Priority Matrix Based on Equipment Criticality and Risk
Job Plan and Standard Task List Writing with Labour, Tools, Materials and Permits
Material Reservation, Kitting and Staging Before Scheduling
Backlog Measurement in Crew-Weeks and Ready Backlog Control
Weekly Schedule Build, Resource Levelling and the Operations Coordination Meeting
Day 4: Preventive Maintenance Set-Up, Data Integrity and CMMS Adoption Problems
Preventive Maintenance Plan Configuration: Time, Meter and Condition Triggers in the CMMS
PM Task Review to Remove Duplicate, Low-Value and Missing Tasks
Work Order Close-Out Quality: Completion Notes, Actual Hours and Failure Coding Audits
Master Data Cleansing: Duplicate Equipment, Orphan Records and Obsolete Spare Parts
CMMS Implementation Roadmap, User Roles, Training and Adoption Measures
Day 5: Case Practice and the Work Management Improvement Plan
Process Plant Case: Backlog Analysis and Priority Reclassification from CMMS Extracts
Facilities Maintenance Case: Weekly Schedule and Daily Assignment Build
KPI Dashboard Calculation: Schedule Compliance, PM Compliance and Wrench Time
Work Management Improvement Plan Drafting with Actions, Owners and Targets
Plan Presentation and Peer Challenge
Skills You Will Gain:
Work Order Management
Job Plan Development
Backlog Control
Weekly Maintenance Scheduling
Equipment Hierarchy Design
Failure Coding
Preventive Maintenance Configuration
Maintenance KPI Reporting
Why Attend This Course:
Return with a Work Management Improvement Plan and a sample weekly schedule built from realistic CMMS data
Reduce crew waiting time for parts, permits and equipment access by preparing complete job packages before work is scheduled
Give managers backlog and compliance figures they can trust because work orders are coded and closed consistently
Compare planning and CMMS practice with peers from oil and gas, utilities, manufacturing and facilities management in several countries
Conclusion:
Maintenance crews are productive when work arrives planned, scheduled and supported by accurate CMMS data. This course moves from the work management cycle and roles, through equipment hierarchy, failure codes and KPI definitions, to job planning, backlog control and weekly scheduling, and then to preventive maintenance set-up, data cleansing and CMMS adoption. The final day applies these methods to case data and produces a Work Management Improvement Plan with a sample weekly schedule ready for review with maintenance and operations leaders.
Maintenance Planning and Scheduling with CMMS: Work Orders, Backlog and KPIs runs in London over 5 days, with 2 upcoming dates in London. The course fee is 23,000 SAR.