Well Plug and Abandonment and Oil and Gas Decommissioning: Barriers, Cement Plugs and Liability – Paris, 7–11 Dec 2026
DestinationParis
Dates7 – 11 December 2026
Reference130_9872
This session
7–11 Dec 2026
This Well Plug and Abandonment and Oil and Gas Decommissioning: Barriers, Cement Plugs and Liability session in Paris runs from Monday 7 December to Friday 11 December 2026 (week 50, Q4 2026). It is the only date in Paris in 2026, at a fee of 23,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 7 Dec – Friday 11 Dec 2026
Week50 of 2026
Duration5 days
Fee23,500 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Late-life fields carry a growing inventory of wells and structures that must be permanently isolated and removed, and poor well plug and abandonment planning leads to failed plug tests, sustained casing pressure, rig overruns and understated decommissioning liabilities. This Core Concept course trains engineers and planners to assess well integrity before P&A, design and verify permanent cement barriers, choose rig or rigless methods, estimate and schedule campaigns, and select removal, leave-in-situ or reuse options for facilities and pipelines. Participants produce a Well Plug and Abandonment Programme and Decommissioning Cost and Liability Estimate.
Course Objectives:
Assess the integrity of wells scheduled for abandonment using well records, annulus pressure data and cement and casing logs
Design permanent well barriers and cement plugs whose depth, length and placement meet the minimum isolation criteria of NORSOK D-010 and the OEUK Well Decommissioning Guidelines
Plan tubing retrieval, casing cutting, section milling and wellhead removal and select between rig, light well intervention and rigless methods
Verify barrier placement through tagging, pressure testing and logging and resolve failed plug tests and sustained casing pressure
Build a P&A cost estimate and campaign schedule with time-depth phases, uncertainty ranges and batch sequencing
Compare removal, leave-in-situ and reuse options for facilities and pipelines and estimate the resulting decommissioning liability, waste streams and environmental effects
Target Audience:
Drilling and completion engineers who plan and supervise abandonment operations on onshore and offshore wells
Well integrity engineers responsible for barrier status, annulus monitoring and well handover records
Decommissioning engineers who prepare end-of-life programmes for wells, facilities and pipelines
Cost engineers and planners who estimate and schedule P&A and removal campaigns
Asset and late-life field engineers who manage cessation of production and liability provisions
HSE and environmental specialists who assess waste, discharges and seabed or site clearance
Course Outline:
Day 1: Late-Life Wells, Decommissioning Drivers and Pre-P&A Integrity Assessment
Decommissioning Life Cycle: Cessation of Production, Well P&A, Facility Removal and Site Clearance
Well Inventory Categorisation by Complexity, Access and Integrity Status
Well Records Review: Casing Tallies, Cement Job Reports and Completion Schematics
Annulus Pressure History and Sustained Casing Pressure Diagnosis
Pre-P&A Well Integrity Survey and Barrier Status Diagram
Day 2: Well Barrier Philosophy and Permanent Barrier Requirements
NORSOK D-010 Well Barrier Envelopes and Well Barrier Element Acceptance Tables
OEUK Well Decommissioning Guidelines: Isolation Criteria for Formation Fluids
Primary, Secondary and Open-Hole-to-Surface Barrier Placement Logic
Barrier Material Qualification: Cement, Formation Creep and Alternative Sealants
Permanent Barrier Schematic for Reservoirs, Flow Potential Zones and Shallow Hazards
Day 3: Cement Plug Design, Casing Removal and Execution Methods
Balanced Cement Plug Design: Slurry Volume, Spacers and Setting Depth
Cement Bond Log and Ultrasonic Log Interpretation Behind Casing
Tubing Retrieval, Casing Cutting and Section Milling Procedures
Perforate, Wash and Cement Technique as an Alternative to Section Milling
Rig, Light Well Intervention and Rigless Method Selection Matrix
Day 4: Plug Verification, Problem Wells, Cost Estimation and Liability
Plug Verification by Tagging, Weight Testing and Pressure Testing
Remediation of Failed Plug Tests, Poor Annular Cement and Collapsed Casing
P&A Time-Depth Cost Model with P10, P50 and P90 Ranges
Campaign Scheduling, Batch Sequencing and Wellhead Severance Planning
Facility and Pipeline Options: Full Removal, Leave in Situ and Reuse with Waste Inventory
Day 5: Case Work: Well P&A Programme and Decommissioning Liability Estimate
Platform Well Case: Barrier Design for a Well with Poor Annular Cement
Onshore Field Case: Rigless Abandonment Sequence for a Multi-Well Pad
Pipeline and Topsides Case: Comparative Assessment of Removal and In-Situ Options
Decommissioning Cost and Liability Estimate Build for a Late-Life Asset
Well Plug and Abandonment Programme Drafting and Peer Challenge
Skills You Will Gain:
Pre-Abandonment Integrity Assessment
Permanent Barrier Design
Cement Log Interpretation
Casing Removal Planning
Plug Verification Testing
P&A Cost Estimating
Decommissioning Comparative Assessment
Liability Provision Planning
Why Attend This Course:
Return with a Well Plug and Abandonment Programme and Decommissioning Cost and Liability Estimate built from a real well and asset case
Reduce repeat plug jobs and rig days by designing barriers that pass verification the first time
Defend P&A estimates and schedules to management and partners with transparent time-depth models and uncertainty ranges
Compare abandonment and removal practice with engineers from operators, drilling contractors and service companies working onshore and offshore
Conclusion:
Permanent well isolation and asset removal are the last engineering decisions an operator makes on a field, and errors are costly to reverse. The course moves from pre-P&A integrity assessment and barrier philosophy, through cement plug design, casing removal and rig or rigless execution, to plug verification, problem wells, cost estimation and facility and pipeline options. The final day applies these methods to platform, onshore and pipeline cases and produces a Well Plug and Abandonment Programme and Decommissioning Cost and Liability Estimate.
Well Plug and Abandonment and Oil and Gas Decommissioning: Barriers, Cement Plugs and Liability runs in Paris over 5 days, with 2 upcoming dates in Paris. The course fee is 23,500 SAR.
Looking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory frameworks, leadership, ESG, governance and project management — open enrolment programmes in central Paris.