This Process Plant Optimisation, Debottlenecking and Energy Conservation session in Paris runs from Monday 1 March to Friday 12 March 2027 (week 9, Q1 2027). It is the 1st of 2 dates in Paris in 2027, at a fee of 42,300 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
DatesMonday 1 Mar – Friday 12 Mar 2027
Week9 of 2027
Duration12 days
Fee42,300 SAR
StatusOpen for registration
FormatIn person
VenueRight Bank business hotel
Programme overview
Introduction:
Process plant optimisation often stalls because units run on unreconciled data, hidden constraints and heat recovery that has drifted since design, so margin is lost every day and capacity projects are chosen on guesswork. This Core Concept course equips engineers to baseline unit performance, reconcile measurements against mass and energy balances, locate the true bottleneck, target heat recovery with pinch analysis and cut fuel and steam use. Week two adds fired heaters, utilities, distillation, advanced control, real-time optimisation and margin. Participants build a Unit Optimisation and Debottlenecking Study for their own plant.
Course Objectives:
Establish a reconciled performance baseline for a process unit from closed mass and energy balances and validated plant data
Identify the active capacity constraint of a unit and evaluate debottlenecking and revamp options on technical and economic grounds
Apply pinch analysis to set heat recovery targets and design retrofit changes to an existing heat exchanger network
Reduce fuel, steam and power consumption in fired heaters, steam systems, distillation columns and exchanger trains through quantified operating and equipment changes
Assess the benefits of advanced process control, inferential sensors and real-time optimisation and set yield and margin targets they can capture
Design a KPI monitoring and continual improvement programme that sustains optimisation gains after the study ends
Target Audience:
Process engineers accountable for unit capacity, yields and operating targets
Technical services and performance monitoring engineers who analyse plant data and run test runs
Energy engineers responsible for fuel, steam and power consumption on process units
Operations engineers and shift leads who implement set point and operating envelope changes
Control and optimisation engineers who maintain APC applications and inferential models
Project and revamp engineers who scope capacity expansion and energy recovery projects
Course Outline:
Day 1: Plant Performance Baselining and Balances
Unit Performance Baseline Definition: Capacity, Yields, Specific Energy and Margin
Overall and Component Mass Balance Closure Around a Process Unit
Energy Balance Envelope: Enthalpy Flows, Fuel Duty and Utility Consumption
Design Versus Actual Gap Analysis Using Datasheets and Historian Trends
Plant Test Run Planning: Steady-State Criteria, Sampling Plan and Instrument Checks
Day 2: Data Reconciliation and Gross Error Detection
Measurement Error Types: Random Noise, Bias and Instrument Drift
Sensor and Topological Redundancy Assessment for a Flowsheet
Weighted Least Squares Reconciliation Against Balance Constraints
Gross Error Detection with the Global Chi-Square Test and Individual Measurement Tests
Unmeasured Variable Estimation and Reconciled Data Set Sign-Off
Day 3: Constraint Identification and Debottlenecking Studies
Capacity Constraint Mapping: Hydraulic, Thermal, Mechanical and Reaction Limits
Equipment Rating Checks for Pumps, Compressors, Columns and Exchangers
Stepwise Throughput Push Test Method and Constraint Shift Analysis
Debottlenecking Option Screening Matrix with Capacity Gain per Unit Cost
Revamp Option Evaluation: Internals Replacement, Parallel Equipment and Process Changes
Day 4: Heat Integration and Pinch Analysis
Stream Data Extraction and Hot and Cold Composite Curves
Problem Table Algorithm and Minimum Approach Temperature Selection
Grand Composite Curve for Utility Level Placement
Cross-Pinch Heat Transfer Diagnosis in an Existing Exchanger Network
Heat Exchanger Network Retrofit Design with Area and Payback Trade-Off
Day 5: Week-One Integrated Debottlenecking Case
Refinery Crude Unit Case: Reconciling Test Run Data and Closing Balances
Preheat Train Case: Pinch Targeting and Retrofit Exchanger Selection
Gas Plant Case: Locating the Active Constraint During a Throughput Increase
Debottlenecking Economics: Incremental Margin, Capital Estimate and Net Present Value
Week-One Findings Review and Study Scope Refinement for Each Participant Unit
Day 6: Fired Heaters, Steam and Utility Systems
Fired Heater Efficiency: Excess Air, Stack Temperature and Draft Control
Heater Coking, Tube Metal Temperature and Duty Limits on Run Length
Steam System Balance: Header Pressures, Letdown Stations and Turbine Versus Motor Drives
Steam Trap Losses, Condensate Recovery and Flash Steam Utilisation
Cooling Water and Refrigeration Optimisation: Approach Temperatures and Compressor Loading
Day 7: Distillation and Heat Exchanger Performance
Column Operating Window: Flooding, Weeping and Entrainment Diagnostics
Reflux Ratio and Pressure Optimisation Against Product Specifications
Column Heat Integration Options: Side Reboilers, Pump-Arounds and Feed Preheat
Exchanger Fouling Resistance Monitoring and Performance Trending
Cleaning Schedule Economics: Fouling Cost Versus Downtime and Cleaning Cost
Day 8: Advanced Process Control and Real-Time Optimisation
Regulatory Control Health Check: Loop Tuning, Valve Performance and Service Factor
Multivariable Model Predictive Control: Manipulated, Controlled and Disturbance Variables
Inferential Sensor Design and Laboratory Bias Updating
Real-Time Optimisation Layer: Steady-State Models, Target Setting and Execution Frequency
APC Benefits Estimation and Operator Acceptance Plan for Control Room Teams
Day 9: Yield, Margin and Continual Improvement Programme
Yield Optimisation: Cut Point, Conversion and Severity Trade-Offs
Margin Model Build: Feed Cost, Product Values and Utility Prices per Unit
Unit KPI Hierarchy: Energy Intensity, Yield, Throughput and Availability Indicators
Performance Monitoring Dashboard and Deviation Alarm Limits
Continual Improvement Cycle: Opportunity Register, Benefit Tracking and Management of Change
Day 10: Capstone Unit Optimisation Study
Capstone Data Pack: Reconciled Baseline and Constraint Map for the Participant Unit
Capstone Energy Target: Pinch Gap and Utility Savings Estimate
Capstone Options Ranking: Debottlenecking, Energy and Control Projects by Margin Gain
Unit Optimisation and Debottlenecking Study Assembly with Improvement Roadmap
Study Presentation to a Mock Technical Review Panel and Peer Challenge
Skills You Will Gain:
Mass and Energy Balance Closure
Plant Data Reconciliation
Constraint and Bottleneck Diagnosis
Pinch Targeting
Fired Heater Tuning
Steam System Balancing
Column Performance Diagnostics
Margin Modelling
Why Attend This Course:
Return with a Unit Optimisation and Debottlenecking Study built on reconciled data from your own process unit
Defend capacity and energy proposals to management with a margin case rather than a design estimate
Recognise when a planned revamp targets the wrong constraint before capital is committed
Compare optimisation practice with peers from refining, gas processing, petrochemicals and chemicals
Conclusion:
Sustained plant gains come from knowing the true baseline, the active constraint and the energy target before spending money. Week one builds that foundation through balances, data reconciliation, debottlenecking studies and pinch analysis. Week two deepens it with fired heaters, steam and utilities, distillation and exchangers, advanced control, real-time optimisation, yield and margin, and a KPI programme. The final day assembles a Unit Optimisation and Debottlenecking Study with a roadmap ready for technical review.