LNG Import Terminal and Regasification: Option Selection, FSRU Operations and Send-Out – Paris, 4–15 Oct 2027
LNG Import Terminal and Regasification: Option Selection, FSRU Operations and Send-Out runs in Paris from Monday 4 October to Friday 15 October 2027 (2 Weeks). The fee is 42,300 SAR per participant. The same programme is also scheduled in 7 other cities.
- Dates
- Length
- 2 Weeks
- Fee per participant
- 42,300 SAR
- Format
- In person, Paris
- Venue
- Right Bank business hotel
- Status
- Open for registration
- Week
- 40 of 2027
- Reference
- 326_12630
This session
4–15 Oct 2027
This LNG Import Terminal and Regasification: Option Selection, FSRU Operations and Send-Out session in Paris runs from Monday 4 October to Friday 15 October 2027 (week 40, Q4 2027). It is the 2nd of 2 dates in Paris in 2027, at a fee of 42,300 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
When else does it run in Paris?
- 18 – 29 January 2027 42,300 SAR
- 4 – 15 October 2027 This date 42,300 SAR
How do I book this date?
Register online to request your place, or send us a question about this date first.
Reference for this date: 326_12630. Quote it when you contact us.
Before you book, read our cancellation policy.
Let’s talk about your next step.
Questions about this date
When does LNG Import Terminal and Regasification: Option Selection, FSRU Operations and Send-Out in Paris start and finish?
It starts on Monday 4 October and finishes on Friday 15 October 2027: 2 Weeks.
How much does LNG Import Terminal and Regasification: Option Selection, FSRU Operations and Send-Out in Paris cost?
The fee for this date is 42,300 SAR per participant. Please read our cancellation policy before you book.
Is this date held in person or online?
It is held in person in Paris, at Right Bank business hotel.
What does this programme cover?
An LNG import terminal decision locks in decades of cost and supply risk: a concept chosen without testing demand, site conditions and send-out needs can leave an FSRU idle, a tank farm short of berth windows or a grid without gas at peak. This Core Concept course takes terminal managers, engineers, developers and commercial staff through onshore, FSRU and FSU receiving concepts, option selection, berthing and unloading, tank and boil-off control, send-out pumps, vaporisers, metering, safety systems, scheduling and maintenance. Participants build an Import Terminal Option Study and Operating Plan.
The programme outline covers:
- Introduction
- Course Objectives
- Target Audience
- Course Outline
- Day 1: LNG Import Terminal Concepts and Receiving Functions
- Day 2: Terminal Development Options and Selection Criteria
- Day 3: Marine Interface, Berthing and Cargo Unloading
- Day 4: Storage Tank Inventory and Boil-Off Gas Control
- Day 5: Week-One Case: Terminal Concept and Unloading Walkthrough
- Day 6: Send-Out Pumps, Vaporisers and Gas Metering
- Day 7: Terminal Safety Systems and Process Risk Assurance
- Day 8: Terminal Operations, Cargo Scheduling and Commercial Interfaces
- Day 9: Reliability, Maintenance and Terminal Performance Metrics
- Day 10: Capstone: Import Terminal Option Study and Operating Plan
- Skills You Will Gain
- Why Attend This Course
- Conclusion
Where else does this programme run?
Also scheduled in 7 other cities.
More ways to train
- Every date of this programmeAll destinations and months
- Organisational & Operational Excellence in ParisThis path’s programmes in the same city
- All programmes in ParisLooking for training courses in Paris? CoreConsept Training Center delivers professional training in Paris across European regulatory framew...
- Organisational & Operational ExcellenceEvery programme in this path
- Training for your teamTell us the programme, the number of participants and your preferred dates.