Organisational & Operational Excellence

CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection – Dubai, 21–25 Jun 2027

CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection runs in Dubai from Monday 21 June to Friday 25 June 2027 (1 Week). The fee is 19,500 SAR per participant. The same programme is also scheduled in 7 other cities.

Register for this programme Ask a question

Dates
Length
1 Week
Fee per participant
19,500 SAR
Format
In person, Dubai
Venue
Five-star CBD venue
Status
Open for registration
Week
25 of 2027
Reference
535_17127

This session

21–25 Jun 2027

This CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection session in Dubai runs from Monday 21 June to Friday 25 June 2027 (week 25, Q2 2027). It is the only date in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.

When else does it run in Dubai?

How do I book this date?

Register online to request your place, or send us a question about this date first.

Reference for this date: 535_17127. Quote it when you contact us.

Before you book, read our cancellation policy.

Let’s talk about your next step.

Questions about this date

When does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection in Dubai start and finish?

It starts on Monday 21 June and finishes on Friday 25 June 2027: 1 Week.

How much does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection in Dubai cost?

The fee for this date is 19,500 SAR per participant. Please read our cancellation policy before you book.

Is this date held in person or online?

It is held in person in Dubai, at Five-star CBD venue.

Where else does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection run?

It is also scheduled in 7 other cities: Amsterdam, Barcelona, Dammam, Jeddah, London, Paris and Riyadh.

What does this programme cover?

CNG and LNG fuelling stations for buses, trucks, taxis and delivery fleets combine gas at 200 to 250 bar with cryogenic liquid, so a poorly sited compressor, an undersized cascade or an untested shutdown chain can halt a fleet or cause a gas release beside public traffic. This Core Concept course equips station developers, engineers, inspectors and operators to plan, build, commission and inspect CNG, LNG and L-CNG stations. Each participant produces a station concept layout with a safety review and a periodic inspection checklist.

The programme outline covers:

  • Introduction
  • Course Objectives
  • Target Audience
  • Course Outline
  • Day 1: Natural Gas Vehicles, Fleet Demand and Station Type Selection
  • Day 2: CNG Compression, Drying, Cascade Storage and Dispensing
  • Day 3: LNG and L-CNG Equipment, Station Layout and Separation Distances
  • Day 4: Hazardous Areas, Shutdown Systems, Commissioning and Inspection
  • Day 5: Station Walkthrough, Economics and the Concept Layout Package
  • Skills You Will Gain
  • Why Attend This Course
  • Conclusion
Read the full outline on the programme page ↗

Where else does this programme run?

Also scheduled in 7 other cities.

More ways to train