Organisational & Operational Excellence

CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection – Riyadh, 1–5 Aug 2027

CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection runs in Riyadh from Sunday 1 August to Thursday 5 August 2027 (1 Week). The fee is 20,000 SAR per participant. The same programme is also scheduled in 7 other cities.

Register for this programme Ask a question

Dates
Length
1 Week
Fee per participant
20,000 SAR
Format
In person, Riyadh
Venue
KAFD district five-star
Status
Open for registration
Week
30 of 2027
Reference
535_17137

This session

1–5 Aug 2027

This CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection session in Riyadh runs from Sunday 1 August to Thursday 5 August 2027 (week 30, Q3 2027). It is the only date in Riyadh in 2027, at a fee of 20,000 SAR. Registration is open for this date. It is held in person at KAFD district five-star.

How do I book this date?

Register online to request your place, or send us a question about this date first.

Reference for this date: 535_17137. Quote it when you contact us.

Before you book, read our cancellation policy.

Let’s talk about your next step.

Questions about this date

When does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection in Riyadh start and finish?

It starts on Sunday 1 August and finishes on Thursday 5 August 2027: 1 Week.

How much does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection in Riyadh cost?

The fee for this date is 20,000 SAR per participant. Please read our cancellation policy before you book.

Is this date held in person or online?

It is held in person in Riyadh, at KAFD district five-star.

Where else does CNG and LNG Fuelling Stations: Design, Construction, Commissioning and Inspection run?

It is also scheduled in 7 other cities: Amsterdam, Barcelona, Dammam, Dubai, Jeddah, London and Paris.

What does this programme cover?

CNG and LNG fuelling stations for buses, trucks, taxis and delivery fleets combine gas at 200 to 250 bar with cryogenic liquid, so a poorly sited compressor, an undersized cascade or an untested shutdown chain can halt a fleet or cause a gas release beside public traffic. This Core Concept course equips station developers, engineers, inspectors and operators to plan, build, commission and inspect CNG, LNG and L-CNG stations. Each participant produces a station concept layout with a safety review and a periodic inspection checklist.

The programme outline covers:

  • Introduction
  • Course Objectives
  • Target Audience
  • Course Outline
  • Day 1: Natural Gas Vehicles, Fleet Demand and Station Type Selection
  • Day 2: CNG Compression, Drying, Cascade Storage and Dispensing
  • Day 3: LNG and L-CNG Equipment, Station Layout and Separation Distances
  • Day 4: Hazardous Areas, Shutdown Systems, Commissioning and Inspection
  • Day 5: Station Walkthrough, Economics and the Concept Layout Package
  • Skills You Will Gain
  • Why Attend This Course
  • Conclusion
Read the full outline on the programme page ↗

Where else does this programme run?

Also scheduled in 7 other cities.

More ways to train