Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage – Paris, 13–24 Sep 2027
This session
13–24 Sep 2027
This Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage session in Paris runs from Monday 13 September to Friday 24 September 2027 (week 37, Q3 2027). It is the 1st of 2 dates in Paris in 2027, at a fee of 42,300 SAR, the same for each of them. Registration is open for this date. It is held in person at Right Bank business hotel.
When else does it run in Paris?
- 13 – 24 September 2027 This date 42,300 SAR
- 15 – 26 November 2027 42,300 SAR
How do I book this date?
Register online to request your place, or send us a question about this date first.
Reference for this date: 1625_25840. Quote it when you contact us.
Before you book, read our cancellation policy.
Let’s talk about your next step.
Questions about this date
When does Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage in Paris start and finish?
It starts on Monday 13 September and finishes on Friday 24 September 2027: 2 Weeks.
How much does Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage in Paris cost?
The fee for this date is 42,300 SAR per participant. Please read our cancellation policy before you book.
Is this date held in person or online?
It is held in person in Paris, at Right Bank business hotel.
What does this programme cover?
Hydropower plant engineering, covering turbines, penstocks, powerhouse and pumped storage, is a 2-week course for plant engineering, powerhouse operations, maintenance and owner's engineering teams, ending with a Hydropower Station Upgrade and Pumped-Storage Operating Plan. Many stations run ageing units away from best efficiency, lose head in neglected waterways and miss the balancing value that solar and wind growth creates. Nominees already operate, maintain or assess hydro units; the first week builds turbine, waterway and control skills, the second adds pumped-storage operation, condition monitoring and refurbishment, taught through inspection walkthroughs. CoreConcept Training Center delivers this hydropower plant engineering course.
The programme outline covers:
- Introduction
- Course Objectives
- Target Audience
- Course Outline
- Day 1: Hydropower Fundamentals, Scheme Types and Energy Conversion
- Day 2: Turbine Selection by Head, Specific Speed and Duty
- Day 3: Intakes, Penstocks and Pressure Tunnel Hydraulics
- Day 4: Governors, Generators, Excitation and Powerhouse Layout
- Day 5: Guided Case Study on a Medium-Head Francis Station
- Day 6: Pumped-Storage Machines and Operating Modes
- Day 7: Cavitation, Runner Erosion, Condition Monitoring and Unit Safety
- Day 8: Grid Balancing With Solar and Wind and Operator Coordination
- Day 9: Performance Testing, Station KPIs, Refurbishment and Uprating
- Day 10: Inspection Walkthrough and Station Upgrade and Operating Plan Build
- Skills You Will Gain
- Why Attend This Course
- Conclusion
Where else does this programme run?
Also scheduled in 7 other cities.
Related programmes
In brief
This date in brief
Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage runs in Paris from Monday 13 September to Friday 24 September 2027 (2 Weeks). The fee is 42,300 SAR per participant. The same programme is also scheduled in 7 other cities.
- Dates
- Length
- 2 Weeks
- Fee per participant
- 42,300 SAR
- Format
- In person, Paris
- Venue
- Right Bank business hotel
- Status
- Open for registration
- Week
- 37 of 2027
- Reference
- 1625_25840