Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage – Jeddah, 24 Oct – 4 Nov 2027
This session
24 Oct – 4 Nov 2027
This Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage session in Jeddah runs from Sunday 24 October to Thursday 4 November 2027 (week 42, Q4 2027). It is the only date in Jeddah in 2027, at a fee of 35,100 SAR. Registration is open for this date. It is held in person at Corniche four-star.
How do I book this date?
Register online to request your place, or send us a question about this date first.
Reference for this date: 1625_25845. Quote it when you contact us.
Before you book, read our cancellation policy.
Let’s talk about your next step.
Questions about this date
When does Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage in Jeddah start and finish?
It starts on Sunday 24 October and finishes on Thursday 4 November 2027: 2 Weeks.
How much does Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage in Jeddah cost?
The fee for this date is 35,100 SAR per participant. Please read our cancellation policy before you book.
Is this date held in person or online?
It is held in person in Jeddah, at Corniche four-star.
What does this programme cover?
Hydropower plant engineering, covering turbines, penstocks, powerhouse and pumped storage, is a 2-week course for plant engineering, powerhouse operations, maintenance and owner's engineering teams, ending with a Hydropower Station Upgrade and Pumped-Storage Operating Plan. Many stations run ageing units away from best efficiency, lose head in neglected waterways and miss the balancing value that solar and wind growth creates. Nominees already operate, maintain or assess hydro units; the first week builds turbine, waterway and control skills, the second adds pumped-storage operation, condition monitoring and refurbishment, taught through inspection walkthroughs. CoreConcept Training Center delivers this hydropower plant engineering course.
The programme outline covers:
- Introduction
- Course Objectives
- Target Audience
- Course Outline
- Day 1: Hydropower Fundamentals, Scheme Types and Energy Conversion
- Day 2: Turbine Selection by Head, Specific Speed and Duty
- Day 3: Intakes, Penstocks and Pressure Tunnel Hydraulics
- Day 4: Governors, Generators, Excitation and Powerhouse Layout
- Day 5: Guided Case Study on a Medium-Head Francis Station
- Day 6: Pumped-Storage Machines and Operating Modes
- Day 7: Cavitation, Runner Erosion, Condition Monitoring and Unit Safety
- Day 8: Grid Balancing With Solar and Wind and Operator Coordination
- Day 9: Performance Testing, Station KPIs, Refurbishment and Uprating
- Day 10: Inspection Walkthrough and Station Upgrade and Operating Plan Build
- Skills You Will Gain
- Why Attend This Course
- Conclusion
Where else does this programme run?
Also scheduled in 7 other cities.
Related programmes
In brief
This date in brief
Hydropower Plant Engineering Course: Turbines, Penstocks, Powerhouse and Pumped Storage runs in Jeddah from Sunday 24 October to Thursday 4 November 2027 (2 Weeks). The fee is 35,100 SAR per participant. The same programme is also scheduled in 7 other cities.
- Dates
- Length
- 2 Weeks
- Fee per participant
- 35,100 SAR
- Format
- In person, Jeddah
- Venue
- Corniche four-star
- Status
- Open for registration
- Week
- 42 of 2027
- Reference
- 1625_25845