Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety – Dubai, 13–17 Sep 2027
Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety runs in Dubai from Monday 13 September to Friday 17 September 2027 (1 Week). The fee is 19,500 SAR per participant. The same programme is also scheduled in 7 other cities.
- Dates
- Length
- 1 Week
- Fee per participant
- 19,500 SAR
- Format
- In person, Dubai
- Venue
- Five-star CBD venue
- Status
- Open for registration
- Week
- 37 of 2027
- Reference
- 925_21417
This session
13–17 Sep 2027
This Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety session in Dubai runs from Monday 13 September to Friday 17 September 2027 (week 37, Q3 2027). It is the 2nd of 2 dates in Dubai in 2027, at a fee of 19,500 SAR, the same for each of them. Registration is open for this date. It is held in person at Five-star CBD venue.
When else does it run in Dubai?
- 17 – 21 May 2027 19,500 SAR
- 13 – 17 September 2027 This date 19,500 SAR
How do I book this date?
Register online to request your place, or send us a question about this date first.
Reference for this date: 925_21417. Quote it when you contact us.
Before you book, read our cancellation policy.
Let’s talk about your next step.
Questions about this date
When does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Dubai start and finish?
It starts on Monday 13 September and finishes on Friday 17 September 2027: 1 Week.
How much does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Dubai cost?
The fee for this date is 19,500 SAR per participant. Please read our cancellation policy before you book.
Is this date held in person or online?
It is held in person in Dubai, at Five-star CBD venue.
What does this programme cover?
Concrete pumping and placement go wrong on site in predictable ways: an outrigger pad sinks into soft fill, a delivery line blocks halfway through a slab, a hose whips on restart, a boom swings too close to overhead cables, or trucks bunch and then stop while the placing gang waits. Each stoppage risks cold joints, injuries and wasted loads. This Core Concept course gives pump operators, line hands and concreting supervisors a disciplined routine for setting up boom and line pumps, laying and anchoring pipework, priming, pumping, clearing blockages and washing out. Participants produce a Pump Setup Checklist and Slab Pour Plan for a case pour.
The programme outline covers:
- Introduction
- Course Objectives
- Target Audience
- Course Outline
- Day 1: Concrete Pump Families, Components and Hydraulic Circuits
- Day 2: Placement System Safety Rules and Pumpable Concrete Basics
- Day 3: Pump Positioning, Outrigger Setup and Delivery Line Rigging
- Day 4: Blockages, Hose Whip, Clean-Out and Pump Upkeep
- Day 5: Inspection Walkthrough: Pump Setup Checklist and Slab Pour Plan
- Skills You Will Gain
- Why Attend This Course
- Conclusion
Where else does this programme run?
Also scheduled in 7 other cities.
More ways to train
- Every date of this programmeAll destinations and months
- Organisational & Operational Excellence in DubaiThis path’s programmes in the same city
- All programmes in DubaiLooking for training in Dubai? CoreConsept Training Center delivers professional courses in Dubai across leadership, governance, ESG, projec...
- Organisational & Operational ExcellenceEvery programme in this path
- Training for your teamTell us the programme, the number of participants and your preferred dates.