Organisational & Operational Excellence

Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety – Dammam, 7–11 Mar 2027

Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety runs in Dammam from Sunday 7 March to Thursday 11 March 2027 (1 Week). The fee is 19,500 SAR per participant. The same programme is also scheduled in 7 other cities.

Register for this programme Ask a question

Dates
Length
1 Week
Fee per participant
19,500 SAR
Format
In person, Dammam
Venue
Eastern Province five-star
Status
Open for registration
Week
9 of 2027
Reference
925_21425

This session

7–11 Mar 2027

This Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety session in Dammam runs from Sunday 7 March to Thursday 11 March 2027 (week 9, Q1 2027). It is the only date in Dammam in 2027, at a fee of 19,500 SAR. Registration is open for this date. It is held in person at Eastern Province five-star.

How do I book this date?

Register online to request your place, or send us a question about this date first.

Reference for this date: 925_21425. Quote it when you contact us.

Before you book, read our cancellation policy.

Let’s talk about your next step.

Questions about this date

When does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Dammam start and finish?

It starts on Sunday 7 March and finishes on Thursday 11 March 2027: 1 Week.

How much does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Dammam cost?

The fee for this date is 19,500 SAR per participant. Please read our cancellation policy before you book.

Is this date held in person or online?

It is held in person in Dammam, at Eastern Province five-star.

Where else does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety run?

It is also scheduled in 7 other cities: Amsterdam, Barcelona, Dubai, Jeddah, London, Paris and Riyadh.

What does this programme cover?

Concrete pumping and placement go wrong on site in predictable ways: an outrigger pad sinks into soft fill, a delivery line blocks halfway through a slab, a hose whips on restart, a boom swings too close to overhead cables, or trucks bunch and then stop while the placing gang waits. Each stoppage risks cold joints, injuries and wasted loads. This Core Concept course gives pump operators, line hands and concreting supervisors a disciplined routine for setting up boom and line pumps, laying and anchoring pipework, priming, pumping, clearing blockages and washing out. Participants produce a Pump Setup Checklist and Slab Pour Plan for a case pour.

The programme outline covers:

  • Introduction
  • Course Objectives
  • Target Audience
  • Course Outline
  • Day 1: Concrete Pump Families, Components and Hydraulic Circuits
  • Day 2: Placement System Safety Rules and Pumpable Concrete Basics
  • Day 3: Pump Positioning, Outrigger Setup and Delivery Line Rigging
  • Day 4: Blockages, Hose Whip, Clean-Out and Pump Upkeep
  • Day 5: Inspection Walkthrough: Pump Setup Checklist and Slab Pour Plan
  • Skills You Will Gain
  • Why Attend This Course
  • Conclusion
Read the full outline on the programme page ↗

Where else does this programme run?

Also scheduled in 7 other cities.

More ways to train