Organisational & Operational Excellence

Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety – Jeddah, 19–23 Sep 2027

Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety runs in Jeddah from Sunday 19 September to Thursday 23 September 2027 (1 Week). The fee is 19,500 SAR per participant. The same programme is also scheduled in 7 other cities.

Register for this programme Ask a question

Dates
Length
1 Week
Fee per participant
19,500 SAR
Format
In person, Jeddah
Venue
Corniche four-star
Status
Open for registration
Week
37 of 2027
Reference
925_21426

This session

19–23 Sep 2027

This Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety session in Jeddah runs from Sunday 19 September to Thursday 23 September 2027 (week 37, Q3 2027). It is the only date in Jeddah in 2027, at a fee of 19,500 SAR. Registration is open for this date. It is held in person at Corniche four-star.

How do I book this date?

Register online to request your place, or send us a question about this date first.

Reference for this date: 925_21426. Quote it when you contact us.

Before you book, read our cancellation policy.

Let’s talk about your next step.

Questions about this date

When does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Jeddah start and finish?

It starts on Sunday 19 September and finishes on Thursday 23 September 2027: 1 Week.

How much does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety in Jeddah cost?

The fee for this date is 19,500 SAR per participant. Please read our cancellation policy before you book.

Is this date held in person or online?

It is held in person in Jeddah, at Corniche four-star.

Where else does Concrete Pumping and Placement: Boom and Line Pump Setup, Blockages and Safety run?

It is also scheduled in 7 other cities: Amsterdam, Barcelona, Dammam, Dubai, London, Paris and Riyadh.

What does this programme cover?

Concrete pumping and placement go wrong on site in predictable ways: an outrigger pad sinks into soft fill, a delivery line blocks halfway through a slab, a hose whips on restart, a boom swings too close to overhead cables, or trucks bunch and then stop while the placing gang waits. Each stoppage risks cold joints, injuries and wasted loads. This Core Concept course gives pump operators, line hands and concreting supervisors a disciplined routine for setting up boom and line pumps, laying and anchoring pipework, priming, pumping, clearing blockages and washing out. Participants produce a Pump Setup Checklist and Slab Pour Plan for a case pour.

The programme outline covers:

  • Introduction
  • Course Objectives
  • Target Audience
  • Course Outline
  • Day 1: Concrete Pump Families, Components and Hydraulic Circuits
  • Day 2: Placement System Safety Rules and Pumpable Concrete Basics
  • Day 3: Pump Positioning, Outrigger Setup and Delivery Line Rigging
  • Day 4: Blockages, Hose Whip, Clean-Out and Pump Upkeep
  • Day 5: Inspection Walkthrough: Pump Setup Checklist and Slab Pour Plan
  • Skills You Will Gain
  • Why Attend This Course
  • Conclusion
Read the full outline on the programme page ↗

Where else does this programme run?

Also scheduled in 7 other cities.

More ways to train